Question 1045208: 2 men and 5 boys can do a piece of work in 4 days, while 4 men and 4 boys can do it in 3 days how long would it take one man alone to do it and how many days would it take one boy alone to do it?
Found 3 solutions by josgarithmetic, ikleyn, MathTherapy:
Answer by josgarithmetic(39620)   (Show Source): You can put this solution on YOUR website!
Alternative method is assign variables for each type of person's rate in units of JOB/DAYS, and this gives linear equations.

x for one-boy rate
y for one-man rate






Elimination Method should be more comfortable to use for solving the system.
Multiply first equation by 3, and multiply second equation by 2.
-

-
Subtract second equation from first equation, member by member.



Remember, here the unit of work rate is , so this rate for ONE BOY means "ONE JOB done in 36 DAYS".

You can use the same method for eliminating the x; but here, the best choice is return to , but multiply first equation by 3; and multiply second equation by 5.
.
.
You do it......

Answer by ikleyn(52810)   (Show Source): You can put this solution on YOUR website!
.
See the lesson
    - Solving rate of work problem by reducing to a system of linear equations,
in this site.

You will find there other similar solved problems with detailed solutions.


Answer by MathTherapy(10555)   (Show Source): You can put this solution on YOUR website!
2 men and 5 boys can do a piece of work in 4 days, while 4 men and 4 boys can do it in 3 days how long would it take one man alone to do it and how many days would it take one boy alone to do it?
Isn't this the same as: Linear_Equations_And_Systems_Word_Problems/1045207?
Why did you post it twice? Oh, I see. Maybe because you got an answer that was nowhere near the correct one. Okay!
The correct answer is there now, so you can revisit that problem.
RELATED QUESTIONS

2 men and 5 boys can do a piece of work in 4 days, while 4 men and 4 boys can do it in 3... (answered by josgarithmetic,MathTherapy,ikleyn)
2 men and 5 boys can do piece of work in 4 days , while 4 men and 4 boys can do in 3 day. (answered by Edwin McCravy,oberobic)
4 men and 4 boys can do a piece of work in 3 days while 2 men and 5 boys can finish it... (answered by ankor@dixie-net.com)
2 men can do the same amount of work that 3 boys can do. 4 men and 10 boys can do a piece (answered by josgarithmetic)
1) 2 men and 7 boys can do a piece of work in 4 days. The same work is done by 4 men and... (answered by Edwin McCravy)
If 8 men and 17 boys can do a piece of work in 26 days how many days will it take 4 men... (answered by richwmiller,Vladdroid)
2 men and 5 boys together can a finish a piece of work in 4 days ,while 3 men and h boys... (answered by richwmiller)
2 men and 4 boys can do a piece of work in 10 days, while 4 men and 5 boys can do it in... (answered by LinnW)
If 12 men and 16 boys can do a piece of work in 5 days and 13 men and 24 boys can do the... (answered by ankor@dixie-net.com,kamallohia)