SOLUTION: The cost to produce backpacks with a school's logo can be modeled by
C(b) = 2/5b^2-24b+600
where C(b) represents the cost in dollars to produce b backpacks.
(a) Find the c
Algebra.Com
Question 1025700: The cost to produce backpacks with a school's logo can be modeled by
C(b) = 2/5b^2-24b+600
where C(b) represents the cost in dollars to produce b backpacks.
(a) Find the cost to produce 20 backpacks. (Include units with your numerical answers.)
The cost to produce 20 backpacks would be about ________
(c) How many backpacks can a school get with a budget of $3500?
According to the model, the school can get up to______backpacks with a budget of $3500.
Answer by solver91311(24713) (Show Source): You can put this solution on YOUR website!
(a) Write
in pencil. Then erase every instance of a
and replace it with the number 20. Then do the indicated arithmetic.
(b) Write
in pencil. Then erase
and replace it with 3500. Solve the resulting quadratic equation for
. Discard the negative root and round the positive root DOWN to the next lower integer.
John

My calculator said it, I believe it, that settles it
RELATED QUESTIONS
The B & J co. wants to produce items at a minimum cost to the company. The cost of the... (answered by josmiceli)
The profit of a company can be modeled using the rule P = -C2 + 10C - 16 where P... (answered by ankor@dixie-net.com)
If notebooks cost $2 each and backpacks cost $32 each, which of the following represents... (answered by richard1234)
The cost of producing x items (in hundreds) can be modeled by C (x)= 1/20x^2-4/5x+9 1/5
(answered by Jk22)
I am scratching my head with this problem and could really use some help understanding... (answered by ikleyn)
The school needs to buy more tables. The total cost can be determined using the... (answered by ikleyn)
can someone please help me with this:
Solve the problem.
If the average cost per... (answered by oscargut)
can someone help me with this problem:
Solve the problem.
If the average cost per... (answered by ankor@dixie-net.com)
1. Pollution is expensive to clean up. The cost to clean up p% of pollution is modeled... (answered by Theo)