SOLUTION: A building contractor is to dig a foundation 45 feet long, 25 feet wide, and 9 feet deep. The contractor pays $11 per load for trucks to remove the dirt. Each truckload holds 5 cub
Algebra.Com
Question 862083: A building contractor is to dig a foundation 45 feet long, 25 feet wide, and 9 feet deep. The contractor pays $11 per load for trucks to remove the dirt. Each truckload holds 5 cubic yards. What is the cost to the contractor to have all the dirt hauled away?
Answer by mananth(16946) (Show Source): You can put this solution on YOUR website!
45 feet long, 25 feet wide, and 9 feet deep.
convert to yards
45/3 , 25/3 9/3
Volume = 15*(25/3)*3
375 cu yards
5 cu yards / load
375/5 = 75 loads
$ 11 per load
75 * 11= $825
RELATED QUESTIONS
A building contractor is to dig a foundation 45 feet long, 25 feet wide, and 6 feet deep. (answered by josmiceli)
A building contractor is to dig a foundation 42 feet long, 24 feet wide, and 9 feet deep. (answered by Fombitz)
A building contractor is to dig a foundation 40 feet long, 30 feet wide, and 14 feet... (answered by macston)
A building contractor is to dig a foundation 54 feet long, 25 feet wide, and 6 feet deep. (answered by rfer)
A general contractor is constructing a building that requires a concrete foundation that... (answered by rfer)
A general contractor is constructing a building that requires a concrete foundation that (answered by edjones)
A general contractor is constructing a building that requires a concrete foundation that... (answered by Boreal)
A contractor is building a concrete sidewalk 10 ft. wide by 50 ft. long and 4 inches... (answered by ankor@dixie-net.com)
20 men can dig a tank 40 feet long and 30 feet broad and 10 feet deep in 25 days. In how... (answered by Solver92311,ikleyn)