SOLUTION: There is a flood. A large culvert washes out. To repair the road workers replace the old 6' by 25' culvert (cylinder) with two 4'x 25' culverts. Which can carry the greatest vol
Algebra.Com
Question 323703: There is a flood. A large culvert washes out. To repair the road workers replace the old 6' by 25' culvert (cylinder) with two 4'x 25' culverts. Which can carry the greatest volume of water; the two new smaller culverts or the old larger one?
Found 2 solutions by Fombitz, Alan3354:
Answer by Fombitz(32388) (Show Source): You can put this solution on YOUR website!
The volume of a cylinder is,
The old culvert could hold,
The two new culverts can hold,
As you can see the old culvert holds more than the new ones (32 vs. 36).
Answer by Alan3354(69443) (Show Source): You can put this solution on YOUR website!
There is a flood. A large culvert washes out. To repair the road workers replace the old 6' by 25' culvert (cylinder) with two 4'x 25' culverts. Which can carry the greatest volume of water; the two new smaller culverts or the old larger one?
-----------------
The 6' has a greater cross-sectional area than 2 4' culverts.
It's a function of the square of the diameter.
RELATED QUESTIONS
A concrete culvert that is 10 m long has
an outside diameter of 1 m and an inside... (answered by Alan3354)
An elliptical culvert is 3.2 feet tall and 6.3 feet wide. It is filled with water to a... (answered by ikleyn)
the data shows there is a mean flood of a river of +9.0 feet above flood stage with a... (answered by edjones)
A straight 120ft culvert is built down a hillside that makes an angle of 54.0 degrees... (answered by jsmallt9)
A culvert designed with a semicircular cross-section of diameter d is to be
redesigned... (answered by solver91311)
it takes 8 workers to repair 750 yards of a road. how many days does it take 5 workers... (answered by Alan3354)
Two road crews, working together, repaired 1 mile of road in 4 hours. Working separately, (answered by checkley71)
It takes 4 workers 9 days to lay a stretch of road. How long does it take 6 workers to... (answered by josmiceli)
30 men repair a road in 56 days by working 6 hours daily. In how many days 45 men will... (answered by stanbon)