Question 1018063: A contractor is building a concrete sidewalk 10 ft. wide by 50 ft. long and 4 inches thick. How many cubic feet of concrete is needed?
Answer by ankor@dixie-net.com(22740) (Show Source): You can put this solution on YOUR website!
A contractor is building a concrete sidewalk 10 ft. wide by 50 ft. long and 4 inches thick.
How many cubic feet of concrete is needed?
10 * 50 * = 166 cu ft
RELATED QUESTIONS
A general contractor is constructing a building that requires a concrete foundation that (answered by edjones)
A new sidewalk will be 6feet wide 240 feet long and filled to a depth of 6 inches with... (answered by Boreal)
Jack used 54 ft of forming and 24 cubic ft of concrete to pour a sidewalk 4 inches thick. (answered by Theo)
Sue used 54 ft of forming and 24 cubic ft of concrete to pour a sidewalk 4 inches thick. (answered by ankor@dixie-net.com)
A general contractor is constructing a building that requires a concrete foundation that... (answered by Boreal)
A new sidewalk will be 4 feet wide, 140 feet long, and filled to a depth of (answered by Fombitz,ikleyn)
how many cubic feet of concrete will be needed for a driveway section that is 10 feet... (answered by Fombitz)
You need to order cement to make a concrete sidewalk 3 feet wide and 80 feet long.... (answered by ankor@dixie-net.com)
how many cubic yards of cement are needed to make a concrete walkway around a rectangle... (answered by Edwin McCravy)