SOLUTION: One road crew constructs 450 m of road bed in 12 h. If another crew works at the same rate, how long will it take them to construct another 250 m of road bed?

Algebra.Com
Question 1196376: One road crew constructs 450 m of road bed in 12 h. If another crew works at the same rate, how long will it take them to construct another 250 m of road bed?
Found 2 solutions by Alan3354, josgarithmetic:
Answer by Alan3354(69443)   (Show Source): You can put this solution on YOUR website!
One road crew constructs 450 m of road bed in 12 h. If another crew works at the same rate, how long will it take them to construct another 250 m of road bed?
------------
Depends on the sizes of the crews.

Answer by josgarithmetic(39620)   (Show Source): You can put this solution on YOUR website!
x hours for the two crews working together







Three hours twenty minutes

RELATED QUESTIONS

One road crew can pave a section of highway in 15 h. A second crew can do the same job in (answered by josgarithmetic,ikleyn,Alan3354,greenestamps)
A crew repairs 1/12 mile of road each day, how long will it take the crew to repair a 3/4 (answered by rfer)
One crew can detassel a field of corn in 6 days. Another crew can do the same job in 4... (answered by ankor@dixie-net.com)
One roofing crew of 5 can finish A 3,800-foot roof in 15 hours, ans another crew of 6 can (answered by richwmiller)
A crew working on a section of road can finish it in 20 hours. Another crew can finish it (answered by josgarithmetic)
It takes nine days for 8 worker to pave a stretch of road. If each worker works at the... (answered by Mathtut)
two roads crew working together repaired 1 mile of the road in four hours. working... (answered by ankor@dixie-net.com)
If a crew of 9 workers can paint a house in 14 days. How long will it take a crew of 5 to (answered by ankor@dixie-net.com)
5 Workers can build a road in 20 days. suppose every worker works at the same rate. if... (answered by ankor@dixie-net.com)