SOLUTION: At trench is 180 ft and 12 ft deep , 7 ft wide at the top, and 4 ft at the botton. How many cubic yard of earth been removed ?
Algebra.Com
Question 947498: At trench is 180 ft and 12 ft deep , 7 ft wide at the top, and 4 ft at the botton. How many cubic yard of earth been removed ?
Answer by macston(5194) (Show Source): You can put this solution on YOUR website!
base 1=b1=7 ft, base 2=b2=4 ft, height=h=12 ft, Length=L
The cross section of the trench is a trapezoid
Area of a trapezoid=
The Volume (V)will equal cross sectional area times the length, so
Volume=
V=11880 cu ft
Convert the answer to cubic yards (27 cu ft=1 cu yd)
V=(11880 cu ft)(1 cu yd/27 cu ft)=440 cu yd
ANSWER: 440 cubic yards of dirt were moved to dig the trench.
RELATED QUESTIONS
A trench is 200 ft. long and 12 ft. deep, 8 ft. wide at the top and 4 ft. wide at the... (answered by ewatrrr)
a trench is 160ft long and 10ft deep, 8ft wide at the top and 5ft at the bottom. how many (answered by ankor@dixie-net.com)
A trech is 200 ft. Long and 12 ft. Deep, 8 ft. Wide at the bottom.how many cubic yards of (answered by Alan3354)
A trench is 180 feet long and 12 feet deep,7 feet wide at the top and 4 feet at the... (answered by checkley77)
A dam is 40 ft. long, 12 ft. high, 7 ft. wide at the bottom, and 4 ft. wide at the top.... (answered by ewatrrr)
A trench is 150m long and 10m deep, 6m wide at the top and 3m at the bottom. How many... (answered by Cromlix)
How many cubic feet of earth must be removed in digging an artificial lake 21 ft. deep,... (answered by ikleyn)
A rectangular trench is to be dug which is to be 300 ft long, 36 ft wide and 10 ft deep.... (answered by stanbon)
A river is 1000 ft. wide and 10 ft. deep, and is running at 4 mph. Determine amount of... (answered by mananth)