SOLUTION: How many cubic meters of dirt must be removed when digging for a foundation of a building if the excavation is 32 m long, 12 m wide, and 8 m deep?

Algebra.Com
Question 1093604: How many cubic meters of dirt must be removed when digging for a foundation of a building if the excavation is 32 m long, 12 m wide, and 8 m deep?
Answer by josmiceli(19441)   (Show Source): You can put this solution on YOUR website!
m3

RELATED QUESTIONS

A farmer is digging a pond 32 yards long, 25 yards wide, and 3 yards deep. How many cubic (answered by edjones)
You are digging a hole for a circular swimming pool that is 20 feet in diameter and 48... (answered by fractalier)
The world's longest bridge is 3 separate tunnles built side by side each is a half... (answered by Theo)
Construction: Dirt must be excavated for the foundation of a building 30 yards by 15... (answered by stanbon)
Dirt is to be removed from a foundation that is 120 ft long, 60 ft wide, and 12 ft deep... (answered by josgarithmetic)
How many cubic feet of earth must be removed in digging an artificial lake 21 ft. deep,... (answered by ikleyn)
The Keiko Construction Company is building a house. They need to dig a rectangular... (answered by cathieb1225)
You are digging a hole for a circular swimming pool that is 20 feet in diameter and 38.3... (answered by Boreal,ikleyn)
dirt must be excavated from a foundation of a building 30 yards by 15 yards to a depth of (answered by checkley79)