SOLUTION: the county's new asphalt paving machine can surface one mile of highway in 10 hours. A much older machine can surface one mile in 18 hours. How long will it take them to surface on
Algebra.Com
Question 749509: the county's new asphalt paving machine can surface one mile of highway in 10 hours. A much older machine can surface one mile in 18 hours. How long will it take them to surface one mile of highway, working together? How long will it take them to surface 20 miles?
Found 2 solutions by FrankM, josmiceli:
Answer by FrankM(1040) (Show Source): You can put this solution on YOUR website!
First machine can do 1/10 mile per hour, Second machine, 1/18 mile per hour.
1/10 + 1/18 = 9/90 + 5/90 = 14/90 = 7/45 miles per hour.
A full mile would take 45/7 hours or ANS = 6 3/7 hours.
Multiply by 20, 900/7 = ANS = 128 4/7 hours.
Note - another tutor offered a short cut for this type of problem.
A 10 hr worker and a 18 hour worker combined will do a job in (10*18)/(10+18) hours or 180/28 which is the same 45/7 hours I calculate.
To be sure you get the numerator and denominator correct, be sure the answer makes sense. 2 10 hour workers would combine to do a job in 5 hours, so the 10 and 18 combine must be between 5 and 10.
Answer by josmiceli(19441) (Show Source): You can put this solution on YOUR website!
Rate of resurfacing for new machine:
( 1 mile ) / ( 10 hrs )
Rate for older machine:
( 1 mile ) / ( 18 hrs )
--------------------
Let = the time in hours for them to
resurface 1 mile working together
Multiply both sides by
It will take them 6 hrs and 26 min working together
check:
OK
For 20 miles:
It will take them 128 hrs and 34 min
check:
OK
RELATED QUESTIONS
The county's new asphalt paving machine can surface 1km of highway in 10 hours. A mcuh... (answered by solver91311)
Hey guys, could you please help me with this problem. I'm really having trouble with it.... (answered by Paul)
The country's new paving machine can surface 1km of highway in 8 hours, whereas it takes... (answered by josmiceli)
a new machine that deposits cement for a road requires 12 hours to complete one-half mile (answered by josgarithmetic)
At a soda bottling plant one bottling plant machine can fulfill the daily quota in 10... (answered by josgarithmetic)
one machine can complease a job in 10 minutes if the same job is done by this machine and (answered by MathLover1,josgarithmetic,greenestamps)
a new machine can make 10000 cans three times faster than an older one. With both... (answered by ankor@dixie-net.com)
A new automatic machine can do a job in 1 hour less than an older machine. Together they... (answered by TimothyLamb)
A company produces three types of athletic shirt. A dozen tank tops requires
1 hour on... (answered by stanbon)