|
Tutors Answer Your Questions about Rate-of-work-word-problems (FREE)
Question 505268: A bath tub can be filled by the hot and cold water pipes in 4 minutes, and when full it can be emptied by the waste pipe in 5 minutes. If it is half full, and all three pipes are set running, when will the tub be filled?
Click here to see answer by nerdybill(6960)  |
Question 505410: I really need help with this and need this word problem translated into an algebraic equation with only one variable. Then it needs to be simplified.
Question:
The area of a rectangle is 72 square inches. If the length is 40 inches greater than four times the width, what are the dimensions of the rectangle?
Click here to see answer by ankor@dixie-net.com(15653)  |
Question 505410: I really need help with this and need this word problem translated into an algebraic equation with only one variable. Then it needs to be simplified.
Question:
The area of a rectangle is 72 square inches. If the length is 40 inches greater than four times the width, what are the dimensions of the rectangle?
Click here to see answer by Taxie(4) |
Question 507347: One pipe fills a storage tank in 30 hours. A second pipe fills the same tank in 45 hours. When a third pipe is added and all three pipes are used to fill the tank it only 9 hours. Find how long it takes the third pipe to do the job.
Click here to see answer by lwsshak3(6509) |
Question 507764: It will take 24 men working 9 hours a day each to build a house in 45 days. Given that all men work at the same rate,
a. How nay days will 18 men take to build the same house if they work 8 hours a day ?
b. how many hours per day must 20 men work if the house is to be completed in 48 days ?
Click here to see answer by lwsshak3(6509) |
Question 507802: A and B working together can do a job in 6 2/3 hours. A became ill after 3 hours of working with B. B finished the job, continuing to work alone, in 8 1/4 more hours. How long would it take each working alone to do the job?
Click here to see answer by josmiceli(9681)  |
Question 508350: Mary, sue and bill work at a motel. If each worked alone, it would take mary 10 hours, sue 8 hours and bill 12 hours. One day Mary came to work early and she had cleaned for 2 hours when Sue and bill arrived all three finished the job. How long did they take to finish?
Click here to see answer by lwsshak3(6509) |
Question 508414: A roofer and his assistant working together can finish a roofing job in 4 hours. The roofer working alone could finish the job in 6 hours less than the assistant working alone. How long would it take the roofer working alone?
Click here to see answer by nerdybill(6960)  |
Question 508410: a tank is filled with 2 pipes. the first pipe can fill the tank in 10 hours. But after it has been opened for3 1/3 hours, the second pipe is opened and the tank is filled up in 4 hours more. how long would it take the second pipe to fill the tank? the two pipes have different diameters.
Click here to see answer by ankor@dixie-net.com(15653)  |
Question 509222: Officials begin to release water from a full man-made lake at a rate that would empty the lake in 18 weeks,but a river that can fill the lake in 25 weeks is replenishing the lake at the same time. How long does it take to empty the lake?
Click here to see answer by stanbon(57361) |
Question 510150: Clarissa and Shawna, working together, can paint the exterior of a house in 6 days. Clarissa by herself can complete this in 5 days less than Shawna. how long will it take Clarissa to complete the job by herself?
Click here to see answer by oberobic(2304) |
Question 511128: Tina can wash the windows of an office building in 3/4 the time it takes her apprentice. One day they worked together for 2hrs. 16mins. and then Tina continued alone. It took her 4hrs. 32 mins. more to complete the job. How long would it take her apprentice to wash all the windows alone?
3/4(x) + x = 544
3x + 4x = 2176
7x = 2176
x = 310.86
310.86/60 = 5hr 11mins but this can't be right
Click here to see answer by solver91311(16897)  |
Question 511281: A man and a boy perform a task in 2 days. They completed one half of the task the first day with the man working 8 hours and the boy working 10 hours.
On the next day, they finished the task with the man working 4 hours and the boy working 15 hours. Find how many hours would take for each to do the task working alone.
Click here to see answer by ankor@dixie-net.com(15653)  |
Question 512436: An experienced painter can paint a fence twice as fast as an inexperienced painter. Working together, they can paint the fence in 4 hours. How long would it take the experienced painter to paint it by himself?
Click here to see answer by josmiceli(9681)  |
Question 513102: A pipe can fill a pool by itself in 2 hours. Another pipe can drain a pool filled with water in 3 hours. If 3 pipes of the first kind bring in water to the pool, while 4 pipes drain water, simultaneously, after how many hours will the pool be filled?
Click here to see answer by Alan3354(30993)  |
Question 514762: The big man could do 1/3 of a job in 4 hours. The little man could do 1/2 of the job in 2 hours. If the little man needed to complete 30 jobs and worked for 2 hours alone and then was joined by the big man, how long did it take both of them to finish the remaining jobs?
Click here to see answer by josmiceli(9681)  |
Question 516342: 1.) A pipe can fill a pool in 6 hours. A smaller pipe can fill the same pool in 8 hours. The empty pool needed to be filled as soon as possible, so the caretaker opened both pipes. However, he also mistakenly opened the drain. If the drain can empty the pool in 12 hours, how long will it take to fill the pool with both pipes and drain open?
Click here to see answer by stanbon(57361) |
|
Older solutions: 1..45, 46..90, 91..135, 136..180, 181..225, 226..270, 271..315, 316..360, 361..405, 406..450, 451..495, 496..540, 541..585, 586..630, 631..675, 676..720, 721..765, 766..810, 811..855, 856..900, 901..945, 946..990, 991..1035, 1036..1080, 1081..1125, 1126..1170, 1171..1215, 1216..1260, 1261..1305, 1306..1350, 1351..1395, 1396..1440, 1441..1485, 1486..1530, 1531..1575, 1576..1620, 1621..1665, 1666..1710, 1711..1755, 1756..1800, 1801..1845, 1846..1890, 1891..1935, 1936..1980, 1981..2025, 2026..2070, 2071..2115, 2116..2160, 2161..2205, 2206..2250, 2251..2295, 2296..2340, 2341..2385, 2386..2430, 2431..2475, 2476..2520, 2521..2565, 2566..2610, 2611..2655, 2656..2700, 2701..2745, 2746..2790, 2791..2835, 2836..2880, 2881..2925, 2926..2970, 2971..3015, 3016..3060, 3061..3105, 3106..3150, 3151..3195, 3196..3240, 3241..3285, 3286..3330, 3331..3375, 3376..3420, 3421..3465, 3466..3510, 3511..3555, 3556..3600, 3601..3645
|
| |