SOLUTION: Workman A's rate of doing work is twice that of Workman B's. One day, A & B work together for 8 hrs, then B due to injury stops and A finishes the rest of the job in 2 hrs. How lo
Algebra.Com
Question 984443: Workman A's rate of doing work is twice that of Workman B's. One day, A & B work together for 8 hrs, then B due to injury stops and A finishes the rest of the job in 2 hrs. How long would it take B to complete the job alone?
Answer by josmiceli(19441) (Show Source): You can put this solution on YOUR website!
Let = the fraction of the job that
A & B get done in 8 hrs
= the fraction of the job left
------------------------------------
After B stops working, A works at the rate:
and finishes job
--------------------------------
You are told that A's rate is twice B's so
B's rate must be:
---------------------------------
Add their rates of working to get their rate
working together:
Multiply both sides by
and
-----------------
So, A can do 1/7 of the job in 2 hrs
A can do the whole job in 14 hrs
-----------------------------
This is twice B's rate, so B will take
28 hrs to do the job alone
-------------------------
check:
OK
RELATED QUESTIONS
Workman A's rate of doing work is twice that of Workman B's. One day, A & B work together (answered by ankor@dixie-net.com)
The workman A finishes the job 2 hours faster than the workman C, and 1 hour slower than... (answered by josgarithmetic,josmiceli)
Two workmen have to finish a job. If they work together the job will be done in 12 days.... (answered by josgarithmetic)
Hi, I am having difficulty putting this problem into an equation even though I know the... (answered by ankor@dixie-net.com,scott8148)
If A's rate of doing work is to B's is 6:8 and A does a piece of work in 50 days, how... (answered by rwm,wilmarugsad)
1. find three consecutive even integers whose sum is 42.
2. the difference of the... (answered by ankor@dixie-net.com)
A is thrice as good as workman as B and therefore is able to finish a job in 60 days less (answered by richwmiller)
Completely factor the following: r(s) = 2s2 + st – 2s + t
@ Normally, this would be... (answered by Edwin McCravy)
A and B are the work of a full 8 days. After 6 days, the two work together, 'A' work... (answered by Theo)