SOLUTION: A new crew of painters takes two times as long to paint a small apartment as an experienced crew. Together, both crews can paint the apartment in 6 hours. How many hours does it ta

Algebra.Com
Question 980301: A new crew of painters takes two times as long to paint a small apartment as an experienced crew. Together, both crews can paint the apartment in 6 hours. How many hours does it take the experienced crew to paint the apartment?
Answer by josgarithmetic(39623)   (Show Source): You can put this solution on YOUR website!
CREW_________________RATE
Old__________________1/x
New__________________1/(2x)
Combined_____________1/6

x is the time for the experienced, old crew to do one job.

Basic Fraction Arithmetic lets you solve for x.
Tell if any trouble.

RELATED QUESTIONS

A new crew of painters takes two times as long to paint a small apartment as an... (answered by Solver92311,greenestamps)
A new crew of painters takes two times as long to paint a small apartment as an... (answered by richwmiller)
It takes crew A 4 hours to paint a room. It takes crew B 5 hours to do the same job. How... (answered by josmiceli,Edwin McCravy)
Work crews A, B and C can set up the steel structure of a building in 10 days if they... (answered by god2012)
An experienced painter can paint a fence twice as fast as an inexperienced painter:... (answered by scott8148,ankor@dixie-net.com)
an experienced painter can paint a garage twice as fast as his apprentice. working... (answered by rwm)
One road crew can pave a section of highway in 15 h. A second crew can do the same job in (answered by josgarithmetic,ikleyn,Alan3354,greenestamps)
Two digging crews are competing for a job the first team shows they can dig a foundation... (answered by josgarithmetic)
One crew can put up holiday decorations in the mall in 9 hours. A second crew can put up... (answered by fractalier)