SOLUTION: A group of 3 workers need 20 days to do a certain job. How long would it take a group of 4 workers to do the same job, if each worker performs at the same rate?

Algebra.Com
Question 976149: A group of 3 workers need 20 days to do a certain job. How long would it take a group of 4 workers to do the same job, if each worker performs at the same rate?
Answer by josgarithmetic(39614)   (Show Source): You can put this solution on YOUR website!
This is familiar. Check my solutions from up to yesterday and you might find the same question already answered.


r, rate for one worker;
t, unknown number of days for four workers;

RT=J, basic uniform rates equation for doing a task, piece of work, job. One job is shown in
your example as "1".



RELATED QUESTIONS

A group of 3 workers need 20 days to do a certain job. How long would it take a group of (answered by josgarithmetic)
It takes 20 workers a total of 30 days to pave a highway. How many days would it take 15... (answered by josgarithmetic,askhari139)
If M workers can do a job in D days, how long would it take 40 workers to do the same... (answered by ptaylor)
3 workers can do a job in 36 days. How long would it take 2 workers to finish the same... (answered by macston,Edwin McCravy)
Two workers finished a job in 7.5 days. How long would it take each worker to do the job... (answered by ankor@dixie-net.com)
If it takes 3 workers 15 days to complete a job, how long would it take 5 workers to... (answered by AnlytcPhil)
If it takes workers A and B 2 days to complete a job. And it takes workers B and C 3 days (answered by ankor@dixie-net.com)
Three workers can do a job in 12 days. Two of the workers work twice as fast as the... (answered by josgarithmetic)
If 4 workers do a job in 6 days..How long will 24 workers will need do the... (answered by josgarithmetic)