Question 976111: A group of 3 workers need 20 days to do a certain job. How long would it take a group of 4 workers to do the same job, if each worker performs at the same rate?
Answer by josgarithmetic(39620)   (Show Source): You can put this solution on YOUR website!
RT=J to relate rate, time, job.

r, rate for one worker

Let t be the time for the group of four workers to do the same job.

RELATED QUESTIONS

A group of 3 workers need 20 days to do a certain job. How long would it take a group of... (answered by josgarithmetic)
It takes 20 workers a total of 30 days to pave a highway. How many days would it take 15... (answered by josgarithmetic,askhari139)
If M workers can do a job in D days, how long would it take 40 workers to do the same... (answered by ptaylor)
3 workers can do a job in 36 days. How long would it take 2 workers to finish the same... (answered by macston,Edwin McCravy)
Two workers finished a job in 7.5 days. How long would it take each worker to do the job... (answered by ankor@dixie-net.com)
If it takes 3 workers 15 days to complete a job, how long would it take 5 workers to... (answered by AnlytcPhil)
If it takes workers A and B 2 days to complete a job. And it takes workers B and C 3 days (answered by ankor@dixie-net.com)
Three workers can do a job in 12 days. Two of the workers work twice as fast as the... (answered by josgarithmetic)
If 4 workers do a job in 6 days..How long will 24 workers will need do the... (answered by josgarithmetic)