SOLUTION: A crew repairs 1/12 mile of road each day, how long will it take the crew to repair a 3/4 mile section of road?
Algebra.Com
Question 975160: A crew repairs 1/12 mile of road each day, how long will it take the crew to repair a 3/4 mile section of road?
Answer by rfer(16322) (Show Source): You can put this solution on YOUR website!
(3/4)/(1/12)=
3/4*12/1=36/4=9days
RELATED QUESTIONS
Two road crews, working together, repaired 1 mile of road in 4 hours. Working separately, (answered by checkley71)
two roads crew working together repaired 1 mile of the road in four hours. working... (answered by ankor@dixie-net.com)
One road crew can pave a section of highway in 15 h. A second crew can do the same job in (answered by josgarithmetic,ikleyn,Alan3354,greenestamps)
One road crew constructs 450 m of road bed in 12 h. If another crew works at the same... (answered by Alan3354,josgarithmetic)
A construction crew is lengthening a road that originally measured miles. The crew is... (answered by josgarithmetic)
A construction crew is lengthening a road that originally measured 52 miles. The crew is... (answered by ikleyn)
A 15-person road crew is scheduled to finish repairing a highway in 12 days. On the... (answered by robertb)
A crew working on a section of road can finish it in 20 hours. Another crew can finish it (answered by josgarithmetic)
a company can repair 11/5 km of road in a day. How many days will it take to repair a... (answered by josgarithmetic)