SOLUTION: It took 10 men to paint the roof in 9 days. How long would it take 6 men?

Algebra.Com
Question 974773: It took 10 men to paint the roof in 9 days.
How long would it take 6 men?

Answer by josgarithmetic(39617)   (Show Source): You can put this solution on YOUR website!
RT=J about rates doing JOB.



Does that make good sense to you? Solve for t.
1 is for ONE JOB of Paint The Roof.

RELATED QUESTIONS

three men paint a house in 5 days. How long will it take 2 men to paint the... (answered by ewatrrr)
three men paint a house in 5 days. how long will it take 2 men to paint the... (answered by Alan3354)
It takes 5 men to paint 2 identical houses in 3 days. Assuming that all men work at the... (answered by stanbon)
It took ten men 16 days to paint a house. At that same rate, how many men would it have... (answered by ankor@dixie-net.com)
3 men build a house in 10 days . how long would it take 5... (answered by ankor@dixie-net.com)
6 men take 2 days to paint a house. how long would 2 men take to do the painting ? (answered by htmentor,w_parminder)
6 men can paint a house in 8 days. How long would 4 men... (answered by richwmiller)
17 men can paint a wall in 6 days. How long will 2 men take to paint the same... (answered by stanbon)
if 4 men can paint 50 doors in 3 days how long will it take 6 men to paint 80... (answered by josgarithmetic)