SOLUTION: If a stone magnet laying machine takes a minute to lay a 1 square meter range of slabs on a construction site,how many minutes would it take 1 labourer to lay a square meter range

Algebra.Com
Question 973938: If a stone magnet laying machine takes a minute to lay a 1 square meter range of slabs on a construction site,how many minutes would it take 1 labourer to lay a square meter range of slabs on a construction site?
Answer by Alan3354(69443)   (Show Source): You can put this solution on YOUR website!
That's not something that can be calculated.
RELATED QUESTIONS

How many minutes would it take 1 labourer to lay a square meter range of slabs on a... (answered by Alan3354)
A builder lays a path in a garden. he uses square slabs with sides 45 cm . longe the path (answered by Boreal,dkppathak)
i have 3000 meters that i need to border with concrete slabs, each slab is 80 centemeters (answered by Alan3354)
Abby's job is to order stone slabs for her customers. Each slab measures 1 meter x 1... (answered by josmiceli)
If it takes a machine 1 minute to put caps on 60 bottles, how long will it take the... (answered by solver91311)
on a busy construction site at 1:00p.m. the sound level is 124dB, while at 4:00p.m. it is (answered by ikleyn)
The force F with which a magnet attracts a steel ball is inversely proportional to the... (answered by KMST)
60(m-15)this is the expression to solve the problems. I sure as heck cant get it to work. (answered by scott8148)
gordon is building a rectangular patio 4m long and 2m wide. he is using square slabs with (answered by josgarithmetic)