SOLUTION: How many minutes would it take 1 labourer to lay a square meter range of slabs on a construction site?

Algebra.Com
Question 973936: How many minutes would it take 1 labourer to lay a square meter range of slabs on a construction site?
Answer by Alan3354(69443)   (Show Source): You can put this solution on YOUR website!
It varies.
RELATED QUESTIONS

If a stone magnet laying machine takes a minute to lay a 1 square meter range of slabs on (answered by Alan3354)
To finish construction at a site, it would take 4 bulldozers and 3 shovels 2 days, and it (answered by josmiceli)
3 people take 4 hours to lay slabs. How long will it take 5 people to lay the same slabs? (answered by stanbon)
A builder lays a path in a garden. he uses square slabs with sides 45 cm . longe the path (answered by Boreal,dkppathak)
i have 3000 meters that i need to border with concrete slabs, each slab is 80 centemeters (answered by Alan3354)
A carpet layer can put down 400 square feet of carpeting in 2.5 hours. How many hours... (answered by ikleyn,Alan3354)
A carpet layer can put down 400 square feet of carpeting in 2.5 hours. How many hours... (answered by ikleyn)
A can lay a lawn in 10 hours, B can lay a lawn in 8 hours. What fraction of the lawn... (answered by ewatrrr)
on a busy construction site at 1:00p.m. the sound level is 124dB, while at 4:00p.m. it is (answered by ikleyn)