SOLUTION: Two digging crews are competing for a job the first team shows they can dig a foundation pit in 4 days the second crew takes 5 days to do the same job the project manager suggest t
Algebra.Com
Question 973677: Two digging crews are competing for a job the first team shows they can dig a foundation pit in 4 days the second crew takes 5 days to do the same job the project manager suggest that they were together instead of offering to pay both crews if it will shorten the time frame how long would it take both crews to dig 18 foundation pits.
Answer by josgarithmetic(39617) (Show Source): You can put this solution on YOUR website!
1/4 jobs per day crew
1/5 jobs per day crew
18 jobs wanted; how many days using the two crews at the same time?
RT=J rate time quantity of jobs.
Crews working at the same time on the same job work at the sum of their rates.
;
solve for .
RELATED QUESTIONS
One crew can detassel a field of corn in 6 days. Another crew can do the same job in 4... (answered by ankor@dixie-net.com)
Two crews can complete a job in 45 days when working together. On their own, one crew... (answered by ankor@dixie-net.com)
Please help me! Thank you.
This is from a worksheet:
Crew A and Crew B are digging... (answered by scott8148)
an electrical contractor is planning to complete a lighting job by useing two separate... (answered by richwmiller)
A 3-men crew can do a certain job in 4 hours, while it takes a 4-men crew to do the same... (answered by ankor@dixie-net.com)
two crews are digging an 8-meter tunnel through marble mountain. crew A starts at the... (answered by Alan3354)
Two crews are digging an 800-meter tunnel through Marble Mountain. Crew A starts at the... (answered by ankor@dixie-net.com)
Work crews A, B and C can set up the steel structure of a building in 10 days if they... (answered by god2012)
A father and son are digging a garden that is 7 feet long and 5 feet wide. The father,... (answered by richwmiller)