SOLUTION: if 12men can dig a pit in 5days. how many more men do you require to do the same work in three days?
Algebra.Com
Question 972999: if 12men can dig a pit in 5days. how many more men do you require to do the same work in three days?
Answer by solver91311(24713) (Show Source): You can put this solution on YOUR website!
I already did this one: Question 972997
12 can do the job in 5 days.
12 can do 1/5 of the job in 1 day.
1 can do 1/5 times 1/12 or 1/60 of the job in 1 day
1 can do 3 times 1/60 or 1/20 of the job in 3 days.
So 20 can do the whole job in 3 days.
John

My calculator said it, I believe it, that settles it
RELATED QUESTIONS
12men can dig a pit in 5days. How many more men would you require to dig the same pit in... (answered by solver91311)
8 men can dig a garden in 20 days. After working for 5days, 3men left. How long will it... (answered by josmiceli)
If 6 men can dig a hole in 10 days how many days will it take 12 men to dig the same hole (answered by ikleyn)
a man can complete a work in 5days another man can do the same work in 8days In how many... (answered by josmiceli)
if a man can dig a pit in 10 days while onother man can do it in 20 days.how long will... (answered by josh_jordan)
7 men can dig a drain in 10 days. how many men would dig the same drain in 14 days
(answered by josgarithmetic,ikleyn,greenestamps)
If 6 men can do a piece of work in 14 days, how many men are needed to do the same work... (answered by tutorcecilia,ptaylor)
120 men can do a work in 90 days,how many more men required to complete the same work in... (answered by fractalier)
If 12 men can dig 35 holes in 14 days,
(a) how many men are needed to dig 35 holes in 8... (answered by Alan3354,jorel1380)