SOLUTION: Alan took 4 hours to tile the floor of a room. Gary took 6 hours to tile the floor of the same room. If they worked together, how long would they take to tile the floor of the room
Algebra.Com
Question 972584: Alan took 4 hours to tile the floor of a room. Gary took 6 hours to tile the floor of the same room. If they worked together, how long would they take to tile the floor of the room
Answer by josmiceli(19441) (Show Source): You can put this solution on YOUR website!
Add their rates of working to get their rate working together
Alan's rate:
[ 1 floor tiled ] / [ 4 hrs ]
Gary's rate:
[ 1 floor tiled ] / [ 6 hrs ]
------------------------
Let = time in hrs to tile floor
with both working together
Multiply both sides by
convert hrs to minutes
---------------
Working together, it will take them 2 hrs and 24 min to tile floor
---------------
check:
close enough
RELATED QUESTIONS
Dan can tile a floor in 3 hours. His assistant could tile the same floor in 8 hours. If... (answered by TimothyLamb,Edwin McCravy)
The perimeter of a room is 66 feet.the ratio of its length to its width is 6:5. you want... (answered by mananth)
A room measures 450cm by 25cm. Determine the length of the largest sqaure tile that can... (answered by rfer)
A room Measures 450cm by 250cm. Determine the side of the largest square tile that can be (answered by josmiceli)
How many tiles are needed to cover the floor of a room whose dimensions are 10 feet by 6... (answered by josmiceli,MathLover1,rothauserc)
there is a large and circular room, If the room has a diameter of 96 feet, approximately... (answered by Alan3354)
Jerry can lay a tile floor in 3 hours less time than Jake. If they can work together, the (answered by Theo,MathTherapy)
Can someone please explain the problem
If a room has a width of 5 m, a length of 6 m,... (answered by greenestamps)
Hi
Can someone please help with question
If a room has a width of 5 m, a length of 6... (answered by addingup,jim_thompson5910)