SOLUTION: To complete a work A takes 50%
more time than B. If together they
take 18 days to complete tile work.
How much time shall B take to do it
alone?
Algebra.Com
Question 968961: To complete a work A takes 50%
more time than B. If together they
take 18 days to complete tile work.
How much time shall B take to do it
alone?
Answer by amarjeeth123(570) (Show Source): You can put this solution on YOUR website!
Let the time taken by B alone be x days.
Then the time taken by A alone is 3x/2 days.
In 1 day B can do 1/x of the work.
In 1 day A can do 2/3x of the work.
In 1 day they can together do 1/18th of the work.
1/x+2/3x=1/18
(3+2)/3x=1/18
5/3x=1/18
x=5/3(18)=30 days
B takes 30 days to do it alone.
RELATED QUESTIONS
To complete a work 'A' takes 50% more time than 'B'. If together they take 18 days to... (answered by josgarithmetic,MathTherapy)
: To complete a work 'A' takes 50% more time than 'B'. If together they take 18 days to... (answered by ankor@dixie-net.com)
A does 1/2 as much as B in 3/4 of the time . if together they take 18 days to complete... (answered by jorel1380)
B will take 3 days longer than A to complete a piece of work. If they together can... (answered by richwmiller)
If a takes 8 days to complete a work then how much time will b and c take to complete the (answered by Edwin McCravy)
if 800 people can do a piece of work in 80 days.after 5 days 50 people left.How much more (answered by josgarithmetic)
A alone would take 6 hours more to complete the job than if both A and B would work... (answered by ankor@dixie-net.com)
If A works alone, he would take 4 days
more to complete the job than if both A
and B... (answered by josmiceli)
A and B finish a work together in 6 hours. A, if works alone takes 10 hours to complete... (answered by josgarithmetic)