SOLUTION: It takes 20 workers a total of 30 days to pave a highway. How many days would it take 15 workers to do the same job?

Algebra.Com
Question 967600: It takes 20 workers a total of 30 days to pave a highway. How many days would it take 15 workers to do the same job?
Found 2 solutions by josgarithmetic, askhari139:
Answer by josgarithmetic(39616)   (Show Source): You can put this solution on YOUR website!
"pave a highway" and "the same job", each is ONE job.

For a rate r, of one worker in JOBS per DAY, any number n of workers working at the same time on the job make the rate nr.

, using t for the number of days.
Observe that this follows uniform rate relationship for doing work,
RT=J rate time job-quantity.

Answer by askhari139(3)   (Show Source): You can put this solution on YOUR website!
Assuming that all the workers are equally efficient, i.e., they each one takes the same amount of time to do a given amount of work,
Time taken by 20 workers to finish the job(T20) = 30 days
Time taken by one worker to finish the job(T1) = T20*30 days = 600 days
Time taken by 15 workers to finish the job(T15) = T1/15 = 40 days

RELATED QUESTIONS

If it takes 3 workers 15 days to complete a job, how long would it take 5 workers to... (answered by AnlytcPhil)
A group of 3 workers need 20 days to do a certain job. How long would it take a group of (answered by josgarithmetic)
A group of 3 workers need 20 days to do a certain job. How long would it take a group of... (answered by josgarithmetic)
If 15 workers can complete a job in 20 days, how long should it take 25 workers to... (answered by ankor@dixie-net.com)
If M workers can do a job in D days, how long would it take 40 workers to do the same... (answered by ptaylor)
It takes nine days for 8 worker to pave a stretch of road. If each worker works at the... (answered by Mathtut)
3 workers can do a job in 36 days. How long would it take 2 workers to finish the same... (answered by macston,Edwin McCravy)
It took a crew of 16 workers 2.75 days to do 1/2 the job. Working at the same rate, how... (answered by josgarithmetic,josmiceli)
If it takes workers A and B 2 days to complete a job. And it takes workers B and C 3 days (answered by ankor@dixie-net.com)