SOLUTION: A takes half time than B to do a work. C takes time equal to A and B together. If three together can do the work in 7 days then in how many days A alone can do the work?

Algebra.Com
Question 959538: A takes half time than B to do a work. C takes time equal to A and B together. If three together can do the
work in 7 days then in how many days A alone can do the work?

Answer by josmiceli(19441)   (Show Source): You can put this solution on YOUR website!
Let = number of days for A to
do the work working alone
--------------------------
B takes twice as long to do the work, so
= number of days for B to
do the work working alone
--------------------------
C takes time equal to A and B together, so
= number of days for C to
do the work working alone
---------------------------
A, B, and C together take days
to do the work
--------------
Add their rates of working to get
their rate working together
------------------------

Multiply both sides by





----------------
A takes 12.8333 days working alone
B takes 25.667 days working alone
C takes 38.5 days working alone
---------------------------------
check:




OK



RELATED QUESTIONS

A takes 10 days less than the time B to complete a work. If both A and B together can... (answered by ankor@dixie-net.com)
A takes 10 days less than the time taken by B to finish an embroidery work. If both A and (answered by Theo,mananth)
A, B and C can do a piece of work in 12 days. A alone takes twice as long as B and C... (answered by richwmiller)
to do certain work alone 'A' takes 4 hrs,'B' takes 5 hrs and c takes 6 hrs.how long would (answered by richwmiller)
A can do a piece of work in 30 days,and B can do the same work in 40 days,if both do... (answered by richwmiller)
To complete a work 'A' takes 50% more time than 'B'. If together they take 18 days to... (answered by josgarithmetic,MathTherapy)
: To complete a work 'A' takes 50% more time than 'B'. If together they take 18 days to... (answered by ankor@dixie-net.com)
To complete a work A takes 50% more time than B. If together they take 18 days to... (answered by amarjeeth123)
A takes 6 days less than the time taken by B to finish the piece of work.if A and B... (answered by josgarithmetic)