SOLUTION: Jamie works 3 times faster than Steven. Together, they do a job in 9 hours. How long does it take Steven working alone to do the same job?

Algebra.Com
Question 956544: Jamie works 3 times faster than Steven. Together, they do a job in 9 hours. How long does it take Steven working alone to do the same job?
Answer by josmiceli(19441)   (Show Source): You can put this solution on YOUR website!
Let = Steven's rate of working in jobs/hr
= Jamie's rate of working in jobs/hr
= their rate working together in jobs/hr
------------------
Add their rates of working to get their rate working together




----------------
Steven would take 36 hrs working alone

RELATED QUESTIONS

Miguel works 3 times faster than Steven. Together they do a job in 9 hours. ow long does... (answered by ankor@dixie-net.com)
Miguel works three times faster than Steven together they do a job in nine hours How long (answered by checkley79,Alan3354)
Mary works 2.5 times faster than Peter. Together, they do a job in 12.5 hours. How long... (answered by josgarithmetic,MathTherapy,richwmiller,greenestamps)
Miguel works 1.5 times faster than Maria. Together, they do a job in 7.5 hours. How long... (answered by ikleyn)
It takes Steven 8 hours to clean the yard and mow the yard. Steven and his brother... (answered by stanbon)
working together, jamie and Juan can complete a job in 6 hours. It would take Jamie 9... (answered by stanbon)
Mary works 2.5 times faster than peter.together,they do a job in 12.5 hours.how long does (answered by lwsshak3)
. Peter and Steven take 5 1/3 hours to do a job. Steven alone takes 16 hours to do the... (answered by josgarithmetic,ikleyn,mananth,greenestamps)
it takes steven four times as long to cut the lawn as it does andrew. working together it (answered by ankor@dixie-net.com)