SOLUTION: it takes 8 men 9 hours to dig a trench.how long would it take 6 men to dig the trench if they worked at the same rate?

Algebra.Com
Question 953867: it takes 8 men 9 hours to dig a trench.how long would it take 6 men to dig the trench if they worked at the same rate?

Answer by ankor@dixie-net.com(22740)   (Show Source): You can put this solution on YOUR website!
it takes 8 men 9 hours to dig a trench.
Find the number of man-hrs required to dig the trench
8 * 9 = 72 man-hrs
:
how long would it take 6 men to dig the trench if they worked at the same rate?
let t = time required by 6 men
6t = 72
t = 72/6
t = 12 hrs to do the job with 6 men

RELATED QUESTIONS

6 men can dig a trench in 3 days. How many days will it take 9 men to dig the same trench (answered by Edwin McCravy)
It takes 18 men 6 hours to dig a trench 720 feet long. Working at the same rate, how... (answered by ankor@dixie-net.com)
If it took 8 labourers 28 days to dig a trench,how long will it take 6 labourers working... (answered by stanbon,Edwin McCravy)
Two men dig a trench 30 m long in 3 days. How long would it take 3 men to dig a trench 15 (answered by ikleyn)
If it takes twelve men 8 days to dig a trench how many men does it take in 6... (answered by josgarithmetic)
if 12 men can dig a trench in 8 days, how many men can dig it in 6 days at the same rate? (answered by josmiceli,ptaylor)
If it takes 8 men 9 hours to dig a hole in 20 minutes,how long would it take 10 men to... (answered by josgarithmetic)
If it takes 8 men 9 hours to dig a hole in 20 meters deep,how long would it take 10 men... (answered by ankor@dixie-net.com)
If it takes two men two hours to dig a hole 3 metres long, 3 metres wide and 3 metres... (answered by josgarithmetic)