SOLUTION: it takes 1 person 4500 minutes to take down the seats, how many people will they need to do it in 6 hours?
Algebra.Com
Question 946497: it takes 1 person 4500 minutes to take down the seats, how many people will they need to do it in 6 hours?
Answer by Theo(13342) (Show Source): You can put this solution on YOUR website!
rate * people * time = quantity of work.
the rate is the average rate per person.
you get r*p*t = q
when you have 1 person doing the work, it takes 4500 minutes.
you get p = 1 and t = 4500 in the equation.
the formula becomes:
r*1*4500 = q
solve for r to get r = q/4500.
you want to know how many people it takes to do the same job in 6 hours.
the rate that each person works is presumably the same, which is q/4500.
6 hours is equal to 6 * 60 = 360 minutes.
r is equal to q/4500
t is equal to 360
p is what you want to solve for.
the equation of r*p*t = q becomes:
q/4500 * p * 360 = q
multiply both sides of the equation by 4500 / q to get p * 360 = q * 4500 / q.
simplify to get p * 360 = 4500
divide both sides of this equation by 360 to get p = 4500 / 360.
this results in p = 12.5.
if 1 person does it in 4500 minutes, then 12.5 people are required to do it in 360 minutes.
the value of q was irrelevant because it canceled out.
this means you could have replaced q with any number and the results would be the same.
RELATED QUESTIONS
A printer can print 1 page in 6 seconds. It shuts down for 2 minutes to cool off after... (answered by psbhowmick)
if it takes person A 7 hours to do something, and person b 12 hours to do the same thing, (answered by josmiceli)
If it takes 2 people 4 hours to complete 1 job, with 1 person working 1.5 times faster... (answered by ankor@dixie-net.com)
If 1 person can do the job in 45 hours, how many people would it take to do the job in 3... (answered by Fombitz)
If it takes 2 men to do a job in 12 hours, how many men will it take to do the same job... (answered by ankor@dixie-net.com)
if it takes 10 people working at the same rate 5 hours to pick 300 apples, how many hours (answered by phxladyphx@yahoo.com)
If it takes 4 people 6 hours to landscape a recreation area, how many hours will it take... (answered by edjones)
If it takes 2 people to complete a job in 5 hours, how many people will it take to... (answered by richwmiller)
If it takes 48 people to complete a job in 23 hours how many people will it take to... (answered by richwmiller)