SOLUTION: Dan can tile a floor in 3 hours. His assistant could tile the same floor in 8 hours. If they work together, how long will it take to tile the floor?

Algebra.Com
Question 935386: Dan can tile a floor in 3 hours. His assistant could tile the same floor in 8 hours. If they work together, how long will it take to tile the floor?
Found 2 solutions by TimothyLamb, Edwin McCravy:
Answer by TimothyLamb(4379)   (Show Source): You can put this solution on YOUR website!
r = w/t
t = w/r
---
rates are additive:
r = 1/3 + 1/8
r = 8/24 + 3/24
r = 11/24
t = 1/r
t = 24/11
t = 2.18 hours
---
Free algebra tutoring live chat:
https://sooeet.com/chat.php?gn=algebra
---
Solve and graph linear equations:
https://sooeet.com/math/linear-equation-solver.php
---
Solve quadratic equations with quadratic formula:
https://sooeet.com/math/quadratic-formula-solver.php
---
Solve systems of linear equations up to 6-equations 6-variables:
https://sooeet.com/math/system-of-linear-equations-solver.php
---

Answer by Edwin McCravy(20059)   (Show Source): You can put this solution on YOUR website!
Dan can tile a floor in 3 hours. His assistant could tile the same floor in 8
hours. If they work together, how long will it take to tile the floor?
Two ways to do it, with or without algebra. 

Here's how to do it easily without algebra, just basic math only.

If they could work together for 24 hours, Dan would tile 8 floors and his
assistant would tile 3 floors, or 11 floors in 24 hours or 1 floor in 24/11
hours or 2 2/11 hours.

Edwin


RELATED QUESTIONS

Jerry can lay a tile floor in 3 hours less time than Jake. If they can work together, the (answered by Theo,MathTherapy)
Alan took 4 hours to tile the floor of a room. Gary took 6 hours to tile the floor of the (answered by josmiceli)
Ralph can lay down a floor tile in 5 seconds. Bob can lay down a floor tile in 4 seconds. (answered by stanbon,MathTherapy,ikleyn)
Rick can mop the gym floor in 4 hours, and Ron can mop the gym floor in 3 hours. lf... (answered by josgarithmetic)
Alice can paint a room in 8 hours. Her assistant can paint the same room in 12 hours. How (answered by richwmiller)
tutor quick help plz and solution. Ed required 12 hours to lay linoleum tile on his... (answered by mananth)
Lean made a scale drawing design for a tile floor. It measured 9 inches in length and 15... (answered by josmiceli)
John can paint his room in 5 hours; Toby can paint the same room in 8 hours. How long... (answered by ewatrrr,josmiceli)
Dan can paint the room in 3 hours, Jill can paint the same room in 5 hours. How long will (answered by ikleyn)