SOLUTION: Eduardo takes 3 hours longer to complete a job than Bill. If they can complete the job together in 4 hours, find how long it takes each person to complete the job alone.

Algebra.Com
Question 928256: Eduardo takes 3 hours longer to complete a job than Bill. If they can complete the job together in 4 hours, find how long it takes each person to complete the job alone.

Found 2 solutions by TimothyLamb, MathTherapy:
Answer by TimothyLamb(4379)   (Show Source): You can put this solution on YOUR website!
r = w/t
---
x = ed rate
y = bill rate
t = bill time per job
---
individual rates:
y = 1/t
x = 1/(t + 3)
---
together rate:
x + y = 1/4
1/(t + 3) + 1/t = 1/4
t/t(t + 3) + (t + 3)/t(t + 3) = 1/4
t + (t + 3) = (1/4)t(t + 3)
2t + 3 = (1/4)tt + (3/4)t
(1/4)tt + (3/4)t - 2t - 3 = 0
(1/4)tt + (3/4)t - (6/4)t - 3 = 0
(1/4)tt - (3/4)t - 3 = 0
0.25tt - 0.75t - 3 = 0
---
the above quadratic equation is in standard form, with a=0.25, b=-0.75 and c=-3
---
to solve the quadratic equation, by using the quadratic formula, copy and paste this:
0.25 -0.75 -3
into this solver: https://sooeet.com/math/quadratic-equation-solver.php
---
the quadratic has two real roots at:
---
t = 5.27491722
t = -2.27491722
---
the negative root doesn't fit the problem statement, so use the positive root:
---
answer:
bill time per job = 5.3 hours
ed time per job = 8.3 hours
---
Solve and graph linear equations:
https://sooeet.com/math/linear-equation-solver.php
---
Solve quadratic equations, quadratic formula:
https://sooeet.com/math/quadratic-formula-solver.php
---
Solve systems of linear equations up to 6-equations 6-variables:
https://sooeet.com/math/system-of-linear-equations-solver.php

Answer by MathTherapy(10555)   (Show Source): You can put this solution on YOUR website!

Eduardo takes 3 hours longer to complete a job than Bill. If they can complete the job together in 4 hours, find how long it takes each person to complete the job alone.
    
Time Bill takes to complete job:
Time Eduardo takes to complete job:
You can do the check!!
===================
If you need a complete and detailed solution, let me know!!

Send comments, “thank-yous,” and inquiries to “D” at MathMadEzy@aol.com.
Further help is available, online or in-person, for a fee, obviously.
For FREE info and answers to questions about the ASVAB exam, the NYS 3 – 8 city/state wide exams,GENERAL
MATH and HOMEWORK QUESTIONS, or MATH QUESTIONS related to the Regents Integrated Algebra,
Regents Geometry, Regents Algebra 2/Trigonometry, SHSAT, COOP/HSPT/TACHS, PSAT, SAT, ACT, SSAT/ISEE,
GRE, CLEP, and the TASC/GED, you can visit: http://asvabstudyzone.freeforums.net/.
RELATED QUESTIONS

please help I don't know how to set up an equation to solve this problem Brian takes 2 (answered by josgarithmetic,josmiceli)
It takes Bob 4 hours longer to repair a car than it takes Ken. Working together, they can (answered by checkley79,nerdybill)
Tom and Shondra can complete a job working together in 4 hours. If Shondra takes 6 hours... (answered by lwsshak3)
It takes Bob four hours longer to repair a car than it takes Ken. Working together, they... (answered by richwmiller,phal79)
It takes barry 4 hours to paint his house by himself when working alone. Christy can... (answered by ankor@dixie-net.com)
A painter can finish painting a house in 4 hours. Her assistant takes 6 hours to finish... (answered by Ruli)
A painter can finish painting a house in 3 hours. Her assistant takes 5 hours to finish... (answered by checkley75)
A painter can finish painting a house in 3 hours. Her assistant takes 5 hours to finish... (answered by Alan3354)
John can complete a job alone in 2 hours, and it takes Tim 3 hours to do the same job... (answered by josmiceli)