SOLUTION: 8 men and 16 women can do a work in 8 days.40 men and 48 women can do the same work in 2 days.how many days are required for 6 men and 12 women to do the same work.

Algebra.Com
Question 917391: 8 men and 16 women can do a work in 8 days.40 men and 48 women can do the same work in 2 days.how many days are required for 6 men and 12 women to do the same work.
Found 2 solutions by josgarithmetic, MathTherapy:
Answer by josgarithmetic(39617)   (Show Source): You can put this solution on YOUR website!
Let m = how many days 1 man could do the work if alone;
let w = how many ways 1 woman could do the same work alone.

and

Two equations, two unknown variables; simplify each equation and solve the system.

The first arrangement of workers
to account for 1 job
, and LCD is mw


Second arrangement of workers




Two equal formulas for mw.



This is the relationship between m and w, which through substitution,
allows to find through either of the mw equations, to solve for w and m,
the NUMBER OF DAYS for one woman to do one job and the NUMBER OF DAYS for one man to do one job.

Use this system:


(Further steps, not yet done, but you need to do them.)

You can then answer the actual question from there, using RT=J for
rate time job, uniform work rates formula.

Substituting in the , solving for m gives
days and this means days.

Now, use those to solve the question asked.


Rate in jobs per day for the 6 men and 12 women,


Let t be the number of days for this group to do 1 job.
The uniform rates rule gives:

Solve for t.
-
-
RESULT: days.

Answer by MathTherapy(10552)   (Show Source): You can put this solution on YOUR website!

8 men and 16 women can do a work in 8 days.40 men and 48 women can do the same work in 2 days.how many days are required for 6 men and 12 women to do the same work.

Time 6 men and 12 women take: days
You can do the check!!
===================
If you need a complete and detailed solution, let me know!!
Send comments, “thank-yous,” and inquiries to “D” at MathMadEzy@aol.com.
Further help is available, online or in-person, for a fee, obviously.
For FREE info and answers to questions about the ASVAB exam, the NYS 3 – 8 city/state wide exams,GENERAL
MATH and HOMEWORK QUESTIONS, or MATH QUESTIONS related to the Regents Integrated Algebra,
Regents Geometry, Regents Algebra 2/Trigonometry, SHSAT, COOP/HSPT/TACHS, PSAT, SAT, ACT, SSAT/ISEE,
GRE, CLEP, and the TASC/GED, you can visit: http://asvabstudyzone.freeforums.net/.
RELATED QUESTIONS

2 men and 3 women can do a piece of work in 16 days .In how days can 4 men and 6 women do (answered by richwmiller)
If 12 men and 18 Women can do a piece of work in 14 days . In how many days 8 men and... (answered by srinivas.g,Bibin)
3 men and 7 women can complete a work in 10 days . But 4 men and 6 women need 8 days to... (answered by josmiceli)
3 men and 5 women do a piece of work in 9 days and 2 men and 7 children do the same in 6... (answered by ankor@dixie-net.com)
3 men can do the job of 4 women. If 3 men can do a job in 8 days, in how many days can 5... (answered by richwmiller)
24 men can complete a work in 16 days.32 women can complete the same work in 24 days.16... (answered by josgarithmetic)
5 men, 20 women and 40 boys can do a piece of work in 120 days working 6 hrs a day. In... (answered by jorel555)
if 10 men and 15 women together can do a work in 6 days , 12 men and 27 women do the same (answered by ankor@dixie-net.com)
If 2 men and 3 women can complete a task in 8 days; and 4 men and 5 women can complete a... (answered by Edwin McCravy)