SOLUTION: tutor quick help plz and solution. Ed required 12 hours to lay linoleum tile on his kitchen floor, a job which would take his neighbor Bert only 8 hours to do. They started working
Algebra.Com
Question 909815: tutor quick help plz and solution. Ed required 12 hours to lay linoleum tile on his kitchen floor, a job which would take his neighbor Bert only 8 hours to do. They started working together, but after two hours, Bert had to stop and Ed finished the work alone. How many hours more did it take Ed to finish the job?
Answer by mananth(16946) (Show Source): You can put this solution on YOUR website!
tutor quick help plz and solution. Ed required 12 hours to lay linoleum tile on his kitchen floor, a job which would take his neighbor Bert only 8 hours to do. They started working together, but after two hours, Bert had to stop and Ed finished the work alone. How many hours more did it take Ed to finish the job?
Ed required 12 hours to lay linoleum tile on his kitchen floor,
he does 1/12 of the job in 1 hour
neighbor Bert only 8 hours to do.
he does 1/8 of the job in 1 hour
Together they can do (1/8 +1/12) of the job in 1 hour
=5/24
in 2 hours they do 5*2/24 = 5/12 of the job
Balance job will be 1- 5/12 = 7/12 of the job
Now Ed does 1/12 of the job in 1 hour
he has to do 7/12 of the job
so he will take (7/12)/(1/12)
= 7 hours
RELATED QUESTIONS
tutor quick help plz and solution. One printing press can finish a certain job in 1 1/2... (answered by richwmiller)
tutor quick help plz and solution... (answered by richwmiller)
tutor quick help plz and solution thanks. (answered by richwmiller)
tutor quick help plz and solution. (answered by richwmiller)
Jerry and Sam are laying a hardwood floor. Working alone, Jerry can do the job in 20... (answered by josmiceli)
Jerry can lay a tile floor in 3 hours less time than Jake. If they can work together, the (answered by Theo,MathTherapy)
The kitchen floor of your home is 12’6” in width and 10’4” in length. You have decided... (answered by checkley71)
Ralph can lay down a floor tile in 5 seconds. Bob can lay down a floor tile in 4 seconds. (answered by stanbon,MathTherapy,ikleyn)
jerry and kuba are laying a hardwood floor. working alone jerry can finish the job in 20... (answered by richwmiller)