SOLUTION: A welder requires 24 h to do a job. After the welder and an apprentice work on the job for 12 h, the welder quits. The apprentice finishes the job in 12 h. How long would it take t

Algebra.Com
Question 908925: A welder requires 24 h to do a job. After the welder and an apprentice work on the job for 12 h, the welder quits. The apprentice finishes the job in 12 h. How long would it take the apprentice, working alone, to do the job?
Answer by richwmiller(17219)   (Show Source): You can put this solution on YOUR website!
12/x+12/24+12/x=1
24/x=1/2
48=x

RELATED QUESTIONS

A welder requires 24 h to do a job. After the welder and an apprentice work on the job... (answered by ankor@dixie-net.com)
A welder requires 24 h to do a job. After the welder and an apprentice work on the job... (answered by josgarithmetic)
a welder requires 24 hours to do a job. after the welder and apprentice work on the job... (answered by josgarithmetic,ikleyn)
a welder requires 25 hours to do a job. after the welder and an apprentice work on a job... (answered by ankor@dixie-net.com)
A welder requires 25 hrs to do a job on his own. After a welder and apprentice work on... (answered by ankor@dixie-net.com)
A welder can complete a job in 20 hours. The welder and her apprentice work together on... (answered by josmiceli)
​ two welders work total of 60 hours on a project. One welder made $32/h, while the (answered by ikleyn)
Two welders who work at the same rate are welding the girders of a building. After they... (answered by ankor@dixie-net.com)
two welders who work at the same rate are welding the girders of a building. after they... (answered by robertb)