SOLUTION: If it takes 2 men 2 hours to dig a hole 3 foot long, 3 foot wide, 3 foot deep. How long, working at the same pace, would it take to dig a hole 6 foot long, 6 foot wide, 6 foot deep

Algebra.Com
Question 908550: If it takes 2 men 2 hours to dig a hole 3 foot long, 3 foot wide, 3 foot deep. How long, working at the same pace, would it take to dig a hole 6 foot long, 6 foot wide, 6 foot deep?
Answer by solver91311(24713)   (Show Source): You can put this solution on YOUR website!


The bigger hole is 2 times longer, 2 times wider, and 2 times deeper. 2 times 2 times 2 is 8. So the volume of the bigger hole is 8 times greater than the volume of the smaller hole. It would take 8 times longer, or 2 men 16 hours.

John

My calculator said it, I believe it, that settles it

The Out Campaign: Scarlet Letter of Atheism

RELATED QUESTIONS

If it takes two men two hours to dig a hole 3 metres long, 3 metres wide and 3 metres... (answered by josgarithmetic)
if it takes 7 men 3 hours to dig a hole, how long will it take 2 men ? (answered by josmiceli)
If it takes 8 men 9 hours to dig a hole in 20 meters deep,how long would it take 10 men... (answered by ankor@dixie-net.com)
If it takes two men three hours to dig a hole 4 meter long, four meters wide, and four... (answered by god2012)
It takes a man one hour to dig a hole 2 meters long, 2 meters wide, and 2 meters deep.... (answered by ptaylor)
if 4 men work for 6 hours a day for 3 days to dig a hole. how long will it take 12 men to (answered by macston)
If it takes 6 men 4 days to dig a hole 3 metres deep, how long will it take for 10 men to (answered by josgarithmetic,ikleyn)
If it takes 8 men 9 hours to dig a hole in 20 minutes,how long would it take 10 men to... (answered by josgarithmetic)
suppose it costs $8 to dig a hole 1 foot deep, $6.40 for the second foot, $5.12 for the... (answered by richwmiller)