SOLUTION: It takes copy machine A one hour less to complete a copying task when working alone than it takes copy machine B working alone. If both copiers are used, they can complete the task

Algebra.Com
Question 902682: It takes copy machine A one hour less to complete a copying task when working alone than it takes copy machine B working alone. If both copiers are used, they can complete the task in 72 minutes. How long does it take each machine to complete the task when working alone?
Answer by richwmiller(17219)   (Show Source): You can put this solution on YOUR website!
1/a+1/b=1/x
1/a+1/(a+1)=1/72
(a+1+a)/(a*(a+1))
2a+1/(a^2+a)=1/72
72*(2a+1)=a^2+a
144a+72=a^2+a
a^2-143a-72=0

Solved by pluggable solver: SOLVE quadratic equation with variable
Quadratic equation (in our case ) has the following solutons:



For these solutions to exist, the discriminant should not be a negative number.

First, we need to compute the discriminant : .

Discriminant d=20737 is greater than zero. That means that there are two solutions: .




Quadratic expression can be factored:

Again, the answer is: 143.50173609018, -0.501736090180486. Here's your graph:

a=143.50 a+1=144.50

RELATED QUESTIONS

office has an old copying machine and a new one. together it takes both machines 4 hours... (answered by stanbon)
an office has an old copying machine and a new one. Working together, it takes both... (answered by ankor@dixie-net.com)
An office has an old copying machine and a new one. Working together, it takes both... (answered by richwmiller)
Having problems pulling out an equation from: An office has an old copying machine and a (answered by scott8148)
An office has an old copying machine and a new one. Working together it takes both... (answered by checkley77)
It takes person A 4 hours less than person B to complete a certain task. Working... (answered by josmiceli)
It takes Printing machine A and B working together 2hrs 24min to complete a piece of job. (answered by josmiceli)
Machine A can complete a task in 24 seconds. Together with machine B, the task can be... (answered by nerdybill)
A copy machine can copy a report in 30 mins. When a second copy machine is used at the... (answered by ankor@dixie-net.com)