SOLUTION: 2 men and 4 boys can do a piece of work in 10 days, while 4 men and 5 boys can do it in 6 days. Men and boys are paid wages according to their output. If the daily wage of a man

Algebra.Com
Question 891656: 2 men and 4 boys can do a piece of work in 10 days,
while 4 men and 5 boys can do it in 6 days. Men and
boys are paid wages according to their output. If the
daily wage of a man is `40, then the ratio of daily wages
of a man and a boy will be.

Answer by LinnW(1048)   (Show Source): You can put this solution on YOUR website!
set b = boys rate in work projects per day
m = mens rate in work projects per day
10(2m + 4b) = 1
6(4m + 5b) = 1
Expanding the above
20m + 40b = 1
24m + 30b = 1
Since each equation equals 1
20m + 40b = 24m + 30b
add -20m to each side
40b = 24m -20m +30b
40b = 4m + 30b
add -30b to each side
10b = 4m
divide each side by 4
(10/4)b = m
(2.5)b = m
A mans output is 2.5 times a boys output
Try entering the below into www.wolframalpha.com
10(2m + 4b) = 1 ; 6(4m + 5b) = 1
The rate b = 1/90 and the rate m = 1/36 in terms of work projects per day.

RELATED QUESTIONS

2 men can do the same amount of work that 3 boys can do. 4 men and 10 boys can do a piece (answered by josgarithmetic)
2 men and 5 boys together can a finish a piece of work in 4 days ,while 3 men and h boys... (answered by richwmiller)
2 men and 5 boys can do a piece of work in 4 days, while 4 men and 4 boys can do it in 3... (answered by josgarithmetic,MathTherapy,ikleyn)
2 men and 5 boys can do a piece of work in 4 days, while 4 men and 4 boys can do it in 3... (answered by josgarithmetic,ikleyn,MathTherapy)
If 8 men and 17 boys can do a piece of work in 26 days how many days will it take 4 men... (answered by richwmiller,Vladdroid)
2 men and 3 boys can do a piece of work in 10 days while 3 men and 2 boys can do the same (answered by josgarithmetic)
4 men and 4 boys can do a piece of work in 3 days while 2 men and 5 boys can finish it... (answered by ankor@dixie-net.com)
If 12 men and 16 boys can do a piece of work in 5 days and 13 men and 24 boys can do the... (answered by ankor@dixie-net.com,kamallohia)
If 4 men and 6 boys can finish a piece of work in 24 days, in what time will 8 men and 9... (answered by ankor@dixie-net.com)