SOLUTION: Considering 4 men finishes the work in 2 days, how many men will require to finish the work in half day?
Algebra.Com
Question 889281: Considering 4 men finishes the work in 2 days, how many men will require to finish the work in half day?
Found 2 solutions by josgarithmetic, richwmiller:
Answer by josgarithmetic(39628) (Show Source): You can put this solution on YOUR website!
r = rate of 1 man per day
n = count of men to do the job in half a day
RT=J for rate, time, job.
Each man assumed works at same rate as another man. Rate of a group of men is the sum of the rate of the men in the group
Solve for n.
Answer by richwmiller(17219) (Show Source): You can put this solution on YOUR website!
8 man days to finish the job
16 men will finish it in 1/2 day
RELATED QUESTIONS
10 men can finish the paint on wall in 15 days. How many men are needed to finish the... (answered by stanbon)
100 men can finish a work in 100 days. Every day two men leaves the work. Then how many... (answered by Edwin McCravy)
if 6 men work 6 hours per day, they can finished a job in 6 days. how many days are... (answered by lwsshak3,josgarithmetic)
A piece of work can be done by 5 men in 10 days. After 4 days, 3 men were transferred to... (answered by 12217B)
6 children and 2 men complete a certain peice of work in 6 days ,each child takes twice... (answered by KMST)
if 4 men can finish a work in 5 days, how long will it take 8 men to do the same... (answered by ewatrrr)
12 men working 7 hours a day can finish a job in 6 days. How many more hours a day must 8 (answered by ankor@dixie-net.com)
A certain number of men can finish a piece of work in 10 days. If however there were 10... (answered by ankor@dixie-net.com)
10 men can complete a job in 14 days. How long will it take 4 men to finish the same job... (answered by josgarithmetic)