SOLUTION: a job can be done in as many days as there men in the group. if the number of men is reduced by 4, the job will be delayed by 5 days. How many men were there originally in the gro

Algebra.Com
Question 889065: a job can be done in as many days as there men in the group. if the number of men is reduced by 4, the job will be delayed by 5 days. How many men were there originally in the group?
Found 2 solutions by josgarithmetic, MathTherapy:
Answer by josgarithmetic(39626)   (Show Source): You can put this solution on YOUR website!
One job can be done in d days by d men in the group. if the number of men is reduced by 4, the job will be delayed by 5 days. How many men were there originally in the group?

Reducing the number of men to d-4 makes the 1 job require d+5 days.

The d men in d days did one job. The reduced men, more days arrangement was also for one job. The number of jobs is equal.

RT=J for rate, time, job. We can use r for the one-man work rate.

.
The factor of r occurs on both sides of the equation, and the only other variable resulting in terms in powers of one and two is d. Solve for d.

Answer by MathTherapy(10556)   (Show Source): You can put this solution on YOUR website!

a job can be done in as many days as there men in the group. if the number of men is reduced by 4, the job will be delayed by 5 days. How many men were there originally in the group?

Original number of men:
You can do the check!!
If you need a complete and detailed solution, let me know!!
Send comments, “thank-yous,” and inquiries to “D” at MathMadEzy@aol.com.
Further help is available, online or in-person, for a fee, obviously.
For FREE info and answers to questions about the ASVAB exam, the NYS 3 – 8 city/state wide exams,GENERAL
MATH and HOMEWORK QUESTIONS, or MATH QUESTIONS related to the Regents Integrated Algebra,
Regents Geometry, Regents Algebra 2/Trigonometry, SHSAT, COOP/HSPT/TACHS, PSAT, SAT, ACT, SSAT/ISEE,
GRE, CLEP, and the TASC/GED, you can visit: http://asvabstudyzone.freeforums.net/.
RELATED QUESTIONS

A group of men can do a job in as many days as there are men in the group. If the number... (answered by ankor@dixie-net.com)
A group of men can do a job in as many as there are men in the group. If the number of... (answered by venugopalramana)
A group of men can do a job in as many days as there are men in the group. If the number... (answered by mananth)
A group of men can do a job in as many days as there are men in the group. If the number... (answered by mananth,MathTherapy)
A group of men can do a job in as many as thre are men in the group. If the number of men (answered by venugopalramana)
A piece of work can be done by 5 men in 10 days. After 4 days, 3 men were transferred to... (answered by 12217B)
a piece of work can be done by 40 men in 48 days. after 15 days, 18 men were transferred... (answered by stanbon)
a piece of work can be done by 40 men in 48 days, after 15days, 18 men were transferred... (answered by ankor@dixie-net.com)
In doing a project, a group of workers can complete the work in a certain number of days. (answered by scott8148)