SOLUTION: If it takes 2 days for 5 workers to finish painting a wall at a rate of 6 hours per day, then how long will it take 7 workers to finish painting a wall at a rate of 7 hours per day

Algebra.Com
Question 887869: If it takes 2 days for 5 workers to finish painting a wall at a rate of 6 hours per day, then how long will it take 7 workers to finish painting a wall at a rate of 7 hours per day?
Found 2 solutions by Edwin McCravy, DrBeeee:
Answer by Edwin McCravy(20056)   (Show Source): You can put this solution on YOUR website!
If it takes 2 days for 5 workers to finish painting a wall at a rate of 6 hours
per day, then how long will it take 7 workers to finish painting a wall at a
rate of 7 hours per day?
First of all 2 days at 6 hours per day is 12 hours.

So first of all we'll pretend the problem just speaks of hours like this:

It takes 12 hours for 5 workers to finish painting a wall. How many hours
will it take 7 workers to finish painting a wall?
The least common multiple of 5 workers and 7 workers is 35 workers.

35 workers is 7 times 5, so 35 workers can finish painting 7 walls in 12 hours.

7 workers is only  as many as 35, so it will take 7 workers 5 times as long
or 60 hours to paint 7 walls.  So to paint only 1 wall will take only th as
long as it takes to paint 7 walls.  th of 60 hours is or  or  hours.  
So they'll work 1 7-hour day and will finish after  hours on the
second day.

------------------------

You can also use the worker-time-job formula, which is:



where

W1 = the number of workers in the first situation.
T1 = the number of time units (hours in this case) in the first situation.
J1 = the number of jobs in the first situation.

W2 = the number of workers in the second situation.
T2 = the number of time units (hours in this case) in the second situation.
J2 = the number of jobs in the second situation.

W1 =  5             W2 = 7     
T1 = 12             T2 = the unknown quantity 
J1 =  1             J2 = 1









 hours.  So they'll work 1 7-hour day and will finish after
 hours on the second day.

Edwin

Answer by DrBeeee(684)   (Show Source): You can put this solution on YOUR website!
Given;
It takes 5 workers 2 days to paint a wall at the rate of 6hr/day. This gives us
(1) 5*2*6 = 60 worker-hours to do the job
Now we have 7 workers working at the rate of 7 hr/day or 49 hr/day for all 7.
The number of days is given by
(2) No. of days for 7 workers = 60hr/(49hr/day) or
(3) No. of days for 7 workers = 1.22... days or about
(4) No. of days for 7 workers = 1d,5hr,23m,16s

RELATED QUESTIONS

if 3 workers can finish painting a house in 2 days, how many days will it take 6 workers (answered by josgarithmetic,josmiceli,ikleyn)
It takes 24 days for 8 workers to complete painting a building, how many days will it... (answered by josgarithmetic)
If it takes 3 days for 10 workers to finish a house, how many days will it take 15... (answered by ankor@dixie-net.com)
if 4 painters complete a painting job in 15 days working hours per day, how long would it (answered by ankor@dixie-net.com)
if it takes 6 days for 6 workers to build a garage, how long would it take 9... (answered by Edwin McCravy,ikleyn,greenestamps)
It takes three workers four days to build a wall. How long will it take two workers to... (answered by ewatrrr)
3 men can finish painting a wall measuring 3m by 2m in 2hours. How long will it takes 5... (answered by richwmiller)
A painter can finish painting a house in 5 hours. Her assistant takes 7 hours to finish... (answered by Alan3354)
Amy, Bobby, and Candace are teaming up to paint a wall. If all three work together, it... (answered by richwmiller)