Two ways to work it. First way: The LCM of 1200 persons and 450 persons is 3600 persons. 3600 persons is 3 times as many persons as 1200 persons and 3600 persons is 8 times as many persons as 450 persons. Since 450 persons can build 1 bridge in 45 days, then 3600 persons can build 8 bridges in 45 days. So only 1200 persons will take 3 times as long or 135 days to build 8 bridges. So to build only 1 bridge it will take 1200 persons only 1/8th as long, and 1/8th of 135 days is 135/8 =days. ------------------------------------------------------ Second way: You can also use the worker-time-job formula, which is: where W1 = the number of workers in the first situation. T1 = the number of time units (days in this case) in the first situation. J1 = the number of jobs in the first situation. W2 = the number of workers in the second situation. T2 = the number of time units (days in this case) in the second situation. J2 = the number of jobs in the second situation. W1 = 1200 W2 = 450 T1 = ? (unknown) T2 = 45 J1 = 1 J2 = 1 Reduce that fraction by dividing numerator and denominator by 150 days Edwin