SOLUTION: 4 men and 10 women were put on a work. They completed 1/3 of the work in
4 days. After this 2 men and 2 women were increased. They completed 2/9
more of the work in 2 days. If th
Algebra.Com
Question 884284: 4 men and 10 women were put on a work. They completed 1/3 of the work in
4 days. After this 2 men and 2 women were increased. They completed 2/9
more of the work in 2 days. If the remaining work is to be completed in 3
days, then how many more women must be increased ?
The answer is 8. I need the solution.
Thank You.
Answer by josgarithmetic(39630) (Show Source): You can put this solution on YOUR website!
RT=J Basic Equation, rate, time, job.
Let m = rate for 1 man
Let w = rate for 1 woman
Each work session is build on a term RT but specifically these are in parts of 1/3, 2/9, and the remaining part of the job to make one whole job.
-
-
How many more men, working 3 more day?
Let q = the additional number of men
-
BE SURE YOU UNDERSTAND EACH OF THOSE THREE EQUATIONS BEFORE CONTINUING. The first is accounting for the amount of work in the first four days; the second is accounting for the work in the next two day; the last is accounting for the last portion of the work using unknown q increased men in that last three days of work.
Observe how those THREE equations use THREE unknown variables. This appears to NOT be a linear system. This should not be a major difficulty because the first two equations form a system of TWO equations in TWO unknowns, m and w, to be found first.
SIMPLIFY THE WHOLE SYSTEM:
-
-
and because we really will later want to solve for q,
The simplified equations are shown outlined in .
SOLVE THE SYSTEM:
First solve for m and w in the first two equations as a separate subsystem. I suggest substitution method because the coefficients are not very convenient for using elimination method.
USE the values for m and w found, and compute the value for q.
The rest of that "SOLVE THE SYSTEM" work is undone here but you should (need ) to do it.
RELATED QUESTIONS
2 men and 3 women can do a piece of work in 16 days .In how days can 4 men and 6 women do (answered by richwmiller)
If 2 men and 3 women take 10 days to complete the work.In how many days can 4 men and 3... (answered by josgarithmetic)
3 men and 7 women can complete a work in 10 days . But 4 men and 6 women need 8 days to... (answered by josmiceli)
A piece of work can be done by 6 men and 5 women in 6 days or 3 men and 4 women in 10... (answered by ikleyn,Edwin McCravy)
2 men and 3 women working 7 hours a day finish a work in 5 days. 4 men and 4 women... (answered by solver91311)
12 men can complete a work in ten days. 20 women can complete the same work in twelve... (answered by solver91311,josgarithmetic,MathTherapy)
120 men and 80 women were asked if they drive to work.
Altogether, 1/4 of the people... (answered by ikleyn)
A team of 2 men and 5 women completed one –fourth of a job in 3 days. After 3 days... (answered by stanbon)
1. 20 men can do a piece of work in 30 days.After working for how many days should 5 men... (answered by josgarithmetic)