SOLUTION: two men A and B can finish a work in 16 days and 12 days respectively.A and B are working together after 4 days A left the work,then the remaining work completed by B in how many d

Algebra.Com
Question 883377: two men A and B can finish a work in 16 days and 12 days respectively.A and B are working together after 4 days A left the work,then the remaining work completed by B in how many days?
Answer by Edwin McCravy(20056)   (Show Source): You can put this solution on YOUR website!
two men A and B can finish a work in 16 days and 12 days respectively.A and B are working together after 4 days A left the work,then the remaining work completed by B in how many days?

>>A...can finish a work in 16 days<<
So A's rate is 

>>...B can finish a work in...12 days<<
So B's rate is 

A and B are working together...(for)...4 days
  

So their combined work rate is  



For those 4 days before A left, they had done

 

So, when A left, there was still  of the job left for B to do by
himself. Suppose it took B alone N days to do the remaining  of the
job. Since B's work rate is , the equation is:

 

or



Multiply both sides by LCD=12

N = 5 days.

Edwin

RELATED QUESTIONS

Working alone, two painters, A and B, can paint a building in 12 and 16 days... (answered by ankor@dixie-net.com)
16 men can finish a work in 12 days. After they worked for 4 days, some more men joined... (answered by ikleyn,josgarithmetic)
1.'A' works twice as fast as 'B'. If both of them together take 6 days to complete the... (answered by josmiceli,vvnrichards)
three men A,B and C can complete a job in 8,12,16 days respectively. A , B can work... (answered by Theo)
A,B and C can finish a job in 6 days. If B and C work together, the job will take 9 days; (answered by stanbon,harshachittar)
Three men A,B and C can complete a job in 8,12 and 16 days respectively.A and B work... (answered by richwmiller)
If 4 men and 6 boys can finish a piece of work in 24 days, in what time will 8 men and 9... (answered by ankor@dixie-net.com)
A can do a work in 12 days ;B in 6 days and C in 3 days.A and B start working together... (answered by Edwin McCravy)
A and B together can do a piece of work in 12 days, which B and C together can do in 16... (answered by KMST)