SOLUTION: A can do a piece of work in 2/3 as many days as B, and B can do the same work in 4/5 as many days as C. Together they can do the work in 3 7/11 days. In how many days can A do the

Algebra.Com
Question 880396: A can do a piece of work in 2/3 as many days as B, and B can do the same work in 4/5 as many days as C. Together they can do the work in 3 7/11 days. In how many days can A do the work alone?
Answer by Edwin McCravy(20060)   (Show Source): You can put this solution on YOUR website!

A can do a piece of work in 2/3 as many days as B, and B can do the same work in 4/5 as many days as C. Together they can do the work in 3 7/11 days. In how many days can A do the work alone?
Suppose C can do one complete job in x days.

Then C's work rate in jobs per day is



B can do the same work in 4/5 as many days as C

So B can do the job in  days.

Then B's work rate in jobs per day is



Simplify that compound fraction by multiplying top and bottom by 5

So B's work rate is




A can do a piece of work in 2/3 as many days as B

Since B can do the job in  days,

A can do the job in  days.

So A can do the job in  days

---

Then A's work rate in jobs per day is



Simplify that compound fraction by multiplying top and bottom by 15

So A's work rate is



---

Together they can do the work in 3 7/11 days.
Change  to improper fraction 

Then all three's combine work rate in jobs per day is



Simplify that compound fraction by multiplying top and bottom by 11

So their combined work rate is



---

The equation comes from:

  



Multiply through by the LCD of :











So C can finish the job in 15 days.

The qustion is:

In how many days can A do the work alone?
A can do the job in  days, or 

or 8 days.  That's the answer.

------------------------------------

To check we need how many days it takes B to do the job alone:

B can do the job in  days.

That's  or 12 days.

To check, add their rates in jobs per day to see if we get 



That checks, so we are right.

A can complete the job in 8 days.

Edwin


RELATED QUESTIONS

A can do a piece of work in 2 days as B can do in 3 days. B can do as much work in 4 days (answered by ankor@dixie-net.com)
A can do a piece of work in two-thirds as many day as B,and B can do it in three-fourths... (answered by nyc_function)
1.'A' works twice as fast as 'B'. If both of them together take 6 days to complete the... (answered by josmiceli,vvnrichards)
A can do as much work in 5 days as B can do in 6 days.If both of them work together can... (answered by josmiceli)
In 5 days A can do as much work as B in 6 days. If they work together they can complete 1 (answered by richwmiller)
Jay can do a painting job in 2/3 as many days as Chris can, and Chris can do it in 3/4 as (answered by ankor@dixie-net.com,josgarithmetic,greenestamps,ikleyn)
If Mario can do a piece of work in 3 days and Joey in 2 days, in how many days can they... (answered by Alan3354)
3 men and 5 women do a piece of work in 9 days and 2 men and 7 children do the same in 6... (answered by ankor@dixie-net.com)
A can do 1/3 of certain work in 10 days and B can do 2/5 of the same work in 8 days find... (answered by robertb)