Question 876111: if it take 2 men 8 hours to install a water heater what would be the total man hours?
Answer by josmiceli(19441) (Show Source): You can put this solution on YOUR website!
( 2 men ) x ( 8 hrs ) = 16 man-hrs
RELATED QUESTIONS
Heater A warms a room from 40 degrees to 70 degrees in 5 hours. Heater B can do this job... (answered by josgarithmetic)
Two men can do a piece of work in 8 hours. If one man can do it alone in 14 hours, how... (answered by josmiceli)
Company X can install chairs in a theater in 10 hours. Company Y can install them in 15... (answered by checkley71)
Working together three men can paint a barn in six hours. If each man worked alone, the... (answered by lwsshak3)
If it takes 1 man 2 hours to work, how long would it take 4 men working at the same... (answered by ikleyn)
How would I solve this?
2 men are painting identical size houses. It takes one man 5... (answered by MathLover1)
7 men unloaded a truck in 2 hours and 6 minutes. how long would it take 1 man to unload... (answered by fractalier)
it takes 8 men 9 hours to dig a trench.how long would it take 6 men to dig the trench if... (answered by ankor@dixie-net.com)
Company X can install chairs in a theater in 10 hours. Company Y can install them in 15... (answered by venugopalramana)