SOLUTION: please help me solve this problem
Suppose one carpet layer can carpet an entire house in 4 hours more than the second guy. It takes the two carpet layers together three hours to
Algebra.Com
Question 864356: please help me solve this problem
Suppose one carpet layer can carpet an entire house in 4 hours more than the second guy. It takes the two carpet layers together three hours to carpet the house. HOw long does it take each one alone?
Answer by josmiceli(19441) (Show Source): You can put this solution on YOUR website!
Add their rates of laying carpet to
get their rate working together:
2nd carpet layer:
( 1 house ) / ( t hrs )
1st carpet layer:
( 1 house ) / ( t + 4 )
working together:
( 1 house ) / ( 3 hrs )
-------------------------
Multiply both sides by
completing the square:
Take the square root of both sides
and
------------------------------------
These are the answers in hours. Here's the plot
of the equation
Use the positive solution because you can't
have negative time
RELATED QUESTIONS
Suppose one carpet layer can carpet the entire house in 4 hours more than the second guy. (answered by richwmiller)
a carpet layer wishes to determine the cost of carpeting a rectangular room whose... (answered by Mathtut,jojo14344)
Hi, can you please help me solve this word problem? Suppose one painter can paint an... (answered by Theo)
Suppose you want to install a carpet in a room that measures 18 feet by 22 feet. The... (answered by Alan3354)
This is a word problem that I was given and am having grief solving.
You have a carpet (answered by stanbon)
A rectangular carpet has a perimeter of 264 inches. The length of the carpet is 96 inches (answered by josmiceli)
A carpet layer can put down 400 square feet of carpeting in 2.5 hours. How many hours... (answered by ikleyn,Alan3354)
A carpet layer can put down 400 square feet of carpeting in 2.5 hours. How many hours... (answered by ikleyn)