SOLUTION: If it takes 3 men 4 days to dig a drain how long would it take 2

Algebra.Com
Question 851104: If it takes 3 men 4 days to dig a drain how long would it take 2
Answer by josgarithmetic(39618)   (Show Source): You can put this solution on YOUR website!
No need to ask twice within an hour.

Already done HERE.
http://www.algebra.com/algebra/homework/Rate-of-work-word-problems/Rate-of-work-word-problems.faq.question.851103.html

RELATED QUESTIONS

If 3 men take 4 days to dig a drain how long would it take 2 men (answered by josgarithmetic)
if it takes 4 men 12 days to dig a hole, how long would it take 6... (answered by ptaylor)
if it takes 7 men 3 hours to dig a hole, how long will it take 2 men ? (answered by josmiceli)
If it takes 6 men 6 days to dig 6 holes, how long would it take 100 men to dig 50... (answered by Alan3354)
If it takes 6 men 4 days to dig a hole 3 metres deep, how long will it take for 10 men to (answered by josgarithmetic,ikleyn)
if 4 men work for 6 hours a day for 3 days to dig a hole. how long will it take 12 men to (answered by macston)
if it takes 8 men 9 days to dig a tunnel how long will it take 6 men to dig the same... (answered by ikleyn)
If it takes 3 men 4 days to build a wall how long will it take 2... (answered by stanbon)
Four men can dig a 40 foot well in 4 days. How long would it take for 8 men to dig a 60... (answered by Alan3354,ankor@dixie-net.com)