SOLUTION: A can do a certain work in the same time in which B and C together can do it. If A and B together could do it in 10 days and C alone in 50 days, then B alone could do it in....
Algebra.Com
Question 850678: A can do a certain work in the same time in which B and C together can do it. If A and B together could do it in 10 days and C alone in 50 days, then B alone could do it in....
Answer by josgarithmetic(39616) (Show Source): You can put this solution on YOUR website!
Use all rates as Jobs per Days. Notice that C worker is given enough direct information for a rate value. Start with the rate for C, and create rate equations for B & C, and for A & B.
Rate for C: jobs per day.
Let x = time for A to do 1 job.
Let y = time for B to do 1 job.
First sentence tells, rate for A is equal to the combined rate of B and C.
LCD is 50xy.
Second sentence tells, A and B together do the job in 10 days:
LCD is 10xy.
The system to solve for x and y is:
------------------------
-
------------------------
Solving each of those for xy, and then equating each expression's formula for xy gives
simplifying to
-
Solving the linear equation for a variable, trying y, ;
Picking either system equation, trying , and substitute the expression for y found,
Multiply left and right members by 2, and be sure to obtain this equation:
-----do not try to divide either sides by x thinking that to be simplification; it's a common beginners mistake.
-
The meaningful answer for x is that
.. and use either system equation to find or solve for y. You can also use the linear found earlier.
RELATED QUESTIONS
Andrew can do a certain work in the same time in which Sam and Stuart together can do... (answered by richwmiller)
A,B and C can do a piece of work together in 15 days. B alone can do in 30 days and C... (answered by ankor@dixie-net.com)
A can do 1/3 of certain work in 10 days and B can do 2/5 of the same work in 8 days find... (answered by robertb)
A takes half time than B to do a work. C takes time equal to A and B together. If three... (answered by josmiceli)
A can complete a job in 9 days, B can do the same job in 10 days and C can do it in 15... (answered by richwmiller)
A can do a piece of work in 30 days,and B can do the same work in 40 days,if both do... (answered by richwmiller)
A and B together can complete a work in 12 days.
C alone can complete the same work in... (answered by ikleyn,Theo,greenestamps,math_tutor2020,Edwin McCravy,MathTherapy)
A and B together can do a piece of work in 12 days, which B and C together can do in 16... (answered by KMST)
Jose can do a certain job in 10 days, and Roy can do the same job in 12 days. If two men... (answered by ikleyn,Alan3354,greenestamps)