SOLUTION: It takes 2 hours for 7 cooks to make the dinner for a wedding party. How long would it take 3 cooks to do the same thing?

Algebra.Com
Question 849600: It takes 2 hours for 7 cooks to make the dinner for a wedding party. How long would it take 3 cooks to do the same thing?
Found 2 solutions by josgarithmetic, ewatrrr:
Answer by josgarithmetic(39616)   (Show Source): You can put this solution on YOUR website!
Find the one-cook rate. Seven cooks do the job in 2 hours, so only one cook needs 7 times longer; or hours.

r*t=j for rate, time, job.
One cook, 1/14 jobs per hour.
Three cooks, 3/14 jobs per hour.
-
Let t = time in hours to do this one job.

Answer by ewatrrr(24785)   (Show Source): You can put this solution on YOUR website!
 
Hi
It takes 2 hours for 7 cooks
Let x represent How long would it take 3 cooks

x = 14/3 hr 0r 4 23 hrs
RELATED QUESTIONS

It takes 7 hours for 8 cooks to prepare the food for a wedding rehearsal dinner. How long (answered by stanbon)
It takes 2 hours for 3 cooks to prepare the food for a wedding rehearsal dinner. How... (answered by solver91311)
It takes 9 hrs for 6 cooks to prepare the food for a wedding rehearsal dinner. How long... (answered by richwmiller)
it takes 6hr for 5 cooks to prepare the food for a wedding dinner. How long will it take... (answered by josmiceli,Edwin McCravy)
it takes 4 hours for 9 cooks to prepare a school lunch. How long would it take 6 cooks to (answered by AnlytcPhil,stanbon)
Nine cooks take 4 hours to prepare a school lunch. How long would 6 cooks take to prepare (answered by solver91311)
One cook can make enough food for 350 people a night how many cookies are needed to feed... (answered by josgarithmetic)
3. Keith and Nancy were able to wash a boat in 6 hours together. It takes Nancy 9 hours... (answered by josgarithmetic)
It takes 4 hours for 3 people to do a particular job. How long would it take 2 people to (answered by josgarithmetic)