SOLUTION: Two chefs are preparing a banquet. One chef could prepare the banquet in 2 hour less time than the other. Together, they complete the job in 5 hours. How long would it take the fas

Algebra.Com
Question 842322: Two chefs are preparing a banquet. One chef could prepare the banquet in 2 hour less time than the other. Together, they complete the job in 5 hours. How long would it take the faster chef working alone?"

Answer by richwmiller(17219)   (Show Source): You can put this solution on YOUR website!
5/x+5/(x+2)=1
Two chefs don't work together. One chef and a cook prepare the banquet. Only one is in charge.
x = 9.0990 faster one
x+2 = 11.0990 slower one

RELATED QUESTIONS

as the owner of a banquet hall, you are in charge of catering a reception. There are two... (answered by stanbon)
Consider a chef who must plan a banquet. Possible menu items and the cost data presented... (answered by onyulee)
the total cost of a banquet (answered by richwmiller)
10 chefs can prepare a meal for 536 people in 8 hours. Assuming that the chefs cook at... (answered by macston)
Apprentice pastry chef Michael takes 9 hours longer than pastry chef Sofia to prepare... (answered by ptaylor)
The length of a banquet table is 4 feet longer than 3 time its width. If the perimeter is (answered by ewatrrr)
The senior class at a high school had a banquet that cost $150. If there had been one 5... (answered by greenestamps,ikleyn,MathTherapy)
To rent a certain banquet hall, there is a reservation fee of $4200.00 and an additional... (answered by nerdybill)
A chef is hired to cook a banquet dinner for 150 people. A recipe calls for 5lbs if meat... (answered by ikleyn)