A mechanic requires 2 h to repair a tranmission, whereas an apprentice requires 6 h to make the same repairs. the mechanic worked alone for 1 h and then stopped. how long will it take the apprentice. working alone. to complete the repair? ----------------------------------------- This is a DRT problem, where "D" doesn't stand for "Distance", but stands for "DEEDS DONE", or "fraction of a deed done". So make the following chart. There are four situations to consider: Deeds Rate Time Mechanic doing 1 complete job Apprentice doing 1 complete job Mechanic doing partial job Apprentice doing partial job Let the answer to the question: >>...How long will it take the apprentice. working alone. to complete the repair?...<< be t. So fill in t for the time for the apprectice to do the partial job of completing the job after the mechanic stops. Deeds Rate Time Mechanic doing 1 complete job Apprentice doing 1 complete job Mechanic doing partial job Apprentice doing partial job t ------------------------------------- >>..A mechanic requires 2 h to repair a tranmission..<< That's 1 deed in 2 hours, so fill in 1 deed and 2 hours on the top row: Deeds Rate Time Mechanic doing 1 complete job 1 2 Apprentice doing 1 complete job Mechanic doing partial job Apprentice doing partial job t ------------------------------------- >>..an apprentice requires 6 h to make the same repairs..<< That's 1 deed in 6 hours, so fill in 1 deed and 2 hours on the second row: Deeds Rate Time Mechanic doing 1 complete job 1 2 Apprentice doing 1 complete job 1 6 Mechanic doing partial job Apprentice doing partial job t -------------------------------------- Next we use the formula R =to fill in the rates on the two top lines: Deeds Rate Time Mechanic doing 1 complete job 1 1/2 2 Apprentice doing 1 complete job 1 1/6 6 Mechanic doing partial job Apprentice doing partial job t -------------------------------------- Now, since the mchanic and the apprentice doing the partial jobs work at the same rates as when they do 1 complete job, we can fill in and for the rates in the bottom two rows: Deeds Rate Time Mechanic doing 1 complete job 1 1/2 2 Apprentice doing 1 complete job 1 1/6 6 Mechanic doing partial job 1/2 1 Apprentice doing partial job 1/6 t ------------------------------------------ Next we use the formula D = RT to finish filling in the chart: Deeds Rate Time Mechanic doing 1 complete job 1 1/2 2 Apprentice doing 1 complete job 1 1/6 6 Mechanic doing partial job 1/2 1/2 1 Apprentice doing partial job t/6 1/6 t Now that the chart is complete, we form the equation by observing the partial job which the mechanic did + the partial job which the apprentice did = 1 complete job: 1/2 + t/6 = 1 Can you solve that? If not post again asking how. Answer: t = 3 hours. Actually you can check it easy because you can do the whole thing in your head by looking at it this way. The mechanic does a whole job in 2 hours. So in the one hour he worked, he did half the job. That leave the other half of the job to be done by the apprentice. The apprentice can do a whole job in 6 hours, so he can do the remaining half-job which the mechanic left him with in half that time, or 3 hours. Edwin