SOLUTION: A and B can do a piece of work in 6 days, B and C can do it in 10 days and C and A do it in 15 days. (a) In how many days will A, B and C finish it working together? (b) In how

Algebra.Com
Question 828568: A and B can do a piece of work in 6 days, B and C can do it in 10 days and C and A do it in 15 days.
(a) In how many days will A, B and C finish it working together?
(b) In how many days will A and B finish their working alone?

Answer by josgarithmetic(39614)   (Show Source): You can put this solution on YOUR website!
To start, form all the stated rates as "piece of work per day".

A&B: 1/6
B&C: 1/10
C&A: 1/15

The rates of any combination of these workers is the sum of the rate of the workers in the combination of workers.

Looking at the combinations given, find that C&A rate is missing the rate of B. Looking at A&B, and B&C, If you put these rates together, you find B occurs two times. A&B+B&C-2B=C&A. Putting that into the numeric information which corresponds, , permitting to find the rate for B if working alone.

Handle similarly with the other two individual rates.
B&C+C&A-2C=A&B
-----Solve for C.
'
C&A+A&B-2A=B&C
----Solve for A.

Each of the three equations gives the rate for the single unknown rate depending on whose rate is the unknown variable.

RELATED QUESTIONS

A,B and C can do a piece of work together in 15 days. B alone can do in 30 days and C... (answered by ankor@dixie-net.com)
A and B can do a piece of work in 6 days, B and C can do it in 10 days and C and A can do (answered by richwmiller)
A, B, and C can do a piece of work in 10 days. A and B can do it in 12 days, A and C in... (answered by josmiceli)
A,B, and C can do a piece of work in 10 days. A and B can do it in 12 days, A and C in 20 (answered by dkppathak)
A,B and C do a piece of work in 10 days. A and B can do it in 12 days. A and C in 20... (answered by savvyhush23)
a and b can do a piece of work in 18 days, b and c can do it in 24 days while c and a... (answered by ikleyn)
A and B can do a piece of work in 12 days , B and C can do it in 15 days and C and A can... (answered by richwmiller)
A and B can do a piece of work in 6 days,B and c together in 10 days,c and A together in... (answered by lwsshak3)
A and B can do a piece of work in 72 days. B and C can do it in 120 days. A and C can do (answered by rothauserc)